Laserfiche WebLink
<br />. Interstate Highway 35-W on a detached pedestrian-bicycle overpass or <br /> a reconstructed County Road H bridge that will include bike lanes and a <br /> pedestrian sidewalk, <br /> The off-road paved bikeway will continue 2,200 feet westward along the <br /> south side of County Road H from U,S, Highway 10 to the 3/4-mile <br /> section that winds southward through the New Brighton-Mounds View <br /> segment to the southern boundary of the segment. This section of trail <br /> will connect with the Long Lake Regional Park trail network and the Rice <br /> Creek West Regional Trail Corridor via an underpass under the raised <br /> Minnesota Commercial Railway right-of way. A paved neighborhood <br /> trail access will be provided at the end of Poppyseed Drive, <br /> 3, Cross-Country Skiing - refer to map on page IX-6, <br /> A 3,2-mile groomed cross-country ski trail loop will run between the <br /> trail heads in the Shoreview segment. <br /> 4, Trailheads - refer to maps on pages IX-4, IX-7, and IX-8 <br /> Intermittent trail heads (corridor access points) will be located at three <br /> strategic access points along the corridor. These trailheads will be <br /> located off Lexington Avenue on the east side of the Shoreview <br />. segment, off County Road I on the south side of the Shoreview segment <br /> and on the northeast corner of the New Brighton-Mounds View segment <br /> off Old Highway 8, The trailheads will provide paved vehicular parking, <br /> satellite toilets, drinking fountains, picnic tables with grills, and <br /> informational signage, <br /> 5. Dog Exercise Area - refer to map on page IX-4 and IX-5, <br /> A 14-acre dog exercise area, located in the Shoreview segment <br /> immediately north of the Edgetown Acres neighborhood, wi/I provide a <br /> designated area where dogs will be permitted to be unleashed and <br /> "run free". <br /> Note: Establishment of such an area is a pilot project initiated in 1997, <br /> Continuation or expansion of the service will depend on a positive <br /> experience during the monitoring period (1997-1998), <br />D. Public Service Improvements - water service lines will be installed at the <br /> three trailheads by tapping into existing municipal watermains, <br />. <br /> IX-3 <br />