|
<br />---------- - ---
<br /> B. Maps
<br /> Zoning Map (II x 17).....................................,~.................~....~..............,........$ ,75
<br /> Zoning Map (17 x 35).......................................,..........~................,.....,............ 1.50 .
<br /> Street Map............,""""""'" .........."""....."""" .....""..,.,.."",...."", ....""..""" 2,00
<br /> Aerial Maps (blue line)",..........., "..." ",.." ,.." ",..." ",.., "..", "...",..,....'"...".,..., 3,20
<br /> Half-section Maps~............"....",......""""""""", ......................,',..,',..,",..."..~, 4,50
<br />V. UTILITY HOOK-UP CHARGES
<br /> A. Water Permit
<br /> Water Service Installation........... ........ ...., .............. ....., .....' ...,~__.... ......, ..,.......$ 35,00
<br /> Interior Plumbing (New Home),............,.........~........,...__....,.__..,..................., 5,00
<br /> Interior Plumbing (Existing Home).......................~.....__,............,..,............... 10,00
<br /> Fire Sprinkler (1 st Head).... ........................, ......., ...,__ ..__.. ......... .......,. ..... ..... ,. 15.00
<br /> Each Additional Head.,.." ,.., ".." "....'.',.." ,..""...." "~,., ..~.,' "....", ..,....,. ,..." ,.., 2.50
<br /> Meter Deposit(Minimum)"..",.."",....""..",.."""..",..".,..",...".."""...,.,...", 105,00
<br /> Meter Installation(Minimum).."",..,"',..,",..,"',..,""~"',..,"',....,',., ....".,...",.. 15.00
<br /> Curb Box and Service Lead:
<br /> I" Service connection on unsurfaced street..........,.................,..,.......,........., 150,00
<br /> Restoration of typical road mix street..............,.....................,......,............... 60.00
<br /> Restoration of higher type streel.............,.....,...................,..____...... Set by Engineer
<br /> Larger than 1" service connection...__.....__..,...................__..........,..., Set by Engineer
<br /> Plan Check Fee........,...................,............,.............,..~........,.........., Set by Inspector
<br /> Re- Inspection..,.,..""..",..,...,.,..."",.."",..,.,...""...""",."..".",...",. ....__,....' 10.00
<br /> State S urchaTge".".,.."".."..,....."".."",..". ....,."...",..""...".,...."." ....",..." .50 .
<br /> B. Water Meter/Spacer Char!!es
<br /> Projected Installation Deposit Total
<br /> Meter Charges:
<br /> 3/4" Meter......... ........ $15,00, ............... ..... ............. ,..$1 05,OO.......__,.~........,$120.00
<br /> 1" Meter..,...,....____..__, 20,00..",....""....,...",....."...,., 135.00", ....",.,...,.,.. 155,00
<br /> i-1/2" Meter....,~__...~.. 25.00....,....................,.,.,......., 365,00.................... 390,00
<br /> 2" Meter..................... 30,00.", ...",., ...."...'..,..",'..',.' 455.00,. ...."",...,.,.., 485,00
<br /> Spacer ChaTges (Fee requiTed for all new meteTs),..........,....,.....................~ $ 7.23
<br /> C. Sewer Permit
<br /> New Connections,.,...",..",........, ".....,...."".."..,...,.,..",..", "....." ",....,.......... $ 35.00
<br /> Alterations/Repairs,...,."..".." ....,.. ....."....",...""...",..", ...."" ....".. ......,.....".. 35.00
<br /> Re-Inspection, ",.."""""""'...."",, ,. ,......""""""",...."""""".", """ "."............', V ARIES
<br /> (Consult City Building Inspector)
<br /> State S urchaTge" '.,.,..".,....,.." ...,'... ....,..,..', .....",..,'.,..",....,.", ....,.,......,......,.. .50
<br /> S,A.C...................................................................(lnc1uded in Building Permit Fee)
<br /> D. Inspections
<br /> New: Rough-In..,.,,"....,.. .................."".."".,..,.......,.,........,... ....,., ......,.,...,., V ARIES
<br /> Final."".." ..................., ...........""..'.,...."....,.,.." ......., ...."." .......,....., V ARIES
<br /> Additions:..............""",..".....,....", .....,.,..... ....,.,..".,...,.....", ....."." ....."....... V ARIES .
<br /> (Consult City Building Inspector)
<br />--------------
<br />
|