Laserfiche WebLink
<br /> APPLICATION FOR PARTIAL PAYMENT <br /> CITY OF ARDEN HILLS 1998 STREET RECONSTRUCTION <br /> AND MAINTENANCE IMPROVEMENTS <br />_W File, 37951-003-8001 7/07/98 <br /> Page, 13 <br />ieq. No/ Unit Contract Contract To Date To Date <br />:nDot No Item Unit Price Quantity Amount Quantity Amount <br />------- ------------------------ ------- ---------- --------- ----------- --------- ----------- <br />10 CONSTRUCT MANHOLE EA 1155.00 1. 00 1155.00 1. 00 1155.00 <br />:506.507 (1200mm) <br />11 CONNECT TO EXISTING STORM EA 157.50 1. 00 157.50 1. 00 157.50 <br />506.602 SEWER <br />12 FURNISH AND INSTALL EA 150.00 11.00 1650.00 10.00 1500.00 <br />:506.602 INFILT~~TION SHIELD <br />13 CONCRETE CURB AND GUTTER m 20.90 140.00 2926.00 145.00 3030.50 <br />,531.501 DESIGN B618 <br /> Subtotal: $ 57,470.50 <br />lid Schedule, I - SANDEEN ROAD OVERLAY <br />1 MOBILIZATION LS 30000.00 0.05 1500.00 0.00 0.00 <br />021. 501 <br />. FIELD O,FICE TYPE D EA 4000.00 0.05 200.00 0.00 0.00 <br />.031.501 <br />3 REMOVE BITUMINOUS m2 1. 00 400.00 400.00 0.00 0.00 <br />104.503 PAVEMENT <br />4 REMOVE DRAINAGE STRUCTURE EA 150.00 1. 00 150.00 0.00 O.OC <br />104.503 <br />5 CO~~lON EXCAVATION (P) m3 5.50 80.00 440.00 0.00 0.00 <br />105.501 <br />6 AGGREGATE BASE CLASS V, m3 19.75 80.00 1580.00 0.00 O.OC <br />.211.502 100% CRUSHED LIMEROCK <br />7 MILL BITUMINOUS PAVEMENT m2 1. 75 2100.00 3675.00 2100.00 3675.0C <br />.232.501 <br />8 CONCRETE DRIVEWAY APRON m2 32.62 12.00 391.44 0.00 O.OC <br />.301.503 <br />9 TYPE 41 WEARING COURSE t 27.40 250.00 6850.00 0.00 0.00 <br />,331.508 MIXTURE <br />10 TYPE 31 BASE COURSE t 26.15 51. 00 1333.65 0.00 0.00 <br />,3.14 MIXTURE <br />