<br /> ------- <br />.BRW <br />ti~_, - --------------- <br />~:_1;{.111;~] ADAMES-&MOORE GROUP COMPANY . <br />Mr. Brian Fritsinger <br />July 7, 1998 <br />Page 2 <br />oxygen to produce sulfuric acid). The televising did not indicate significant deterioration of the metal pipe <br />at this time however it is the opinion of the City Engineer that the metal pipe will eventually deteriorate <br />possibly causing a catastrophic failure resulting in significant environmental pollution and repair costs. One <br />manhole on that pipeline segment has deteriorated significantly due to the acidic environment. The <br />rehabilitation of that manhole is also included under Bid Alternate # 1. <br />The City Engineer and Dwayne Stafford reviewed the pipeline segment and determined that a trenchless <br />method of rehabilitation would be the most cost effective since the pipeline runs directly under wetlands and <br />would be extremely difficult to remove and replace. Because the pipeline is a main trunk in the City it carries <br />a significant amount of sewage. Utilizing a trenchless method to rehabilitate the pipeline would minimize <br />the amount of down time for the line. Trenchless pipcliners are designed to act as full structural pipes and <br />will remain even iftlte pipe around them disintegrates. <br />The Bid Alternate #1 work was included in the project at the direction of Council since the original budget <br />did not include the work. The bids received are very similar in cost and were within 3% of the Engineer's <br />Estimate. Infrastructure Technologies, Inc. submitted the highest bid for Bid Alternate #1 however their <br />combined total bid remains the lowest among the three. It is the recommendation oftlte City Engineer that <br />the Council award Bid Alternate # I with the contract. . <br />We, therefore, recommend the award of the 1998 Sanitary Sewer Rehabilitation Program including Bid <br />Alternate #1 to Infrastructure Technologies, Inc. for the total amount of$126,570.25. <br />The project schedule outlined below is contingent upon award by the City Council on July 13, 1998: <br /> A ward Contract July 13, 1998 <br /> Begin Construction July 27, 1998 <br /> Complete Construction September II, 1998 <br />Please call me at 373.6479 if you have any questions or need additional information. <br />Sincerely, <br /> /~ <br /> rown, PE <br />Projec 19meer <br />Enclosure <br />cc: Dwayne Stafford/Arden Hills <br /> Terry Post! Arden Hills <br /> Jon Horn/BRW <br /> Nick Landwer/BRW . <br /> John Knauff/BRW <br /> File 37951 0060101 <br /> Offices Worldwide <br /> ---------- <br />