Laserfiche WebLink
<br /> . City of Arden Hills <br /> West Round Lake Road Phase 2 <br /> Alternative A - 36 Foot Wide Undivided Roadway <br /> WEST ROUND LAKE ROAD CONSTRUCTION <br /> Unit <br /> No. Item Unit Ouantitv Price Extension <br /> 1 Mobilization LS 1.0 $ 25,000.00 $ 25,000.00 <br /> 2 Clearing and Grubbing ha 0.5 $ 5,000.00 $ 2,500.00 <br /> 3 Bituminous Pavement Removal m2 6250.0 $ 2.50 $ 15,625.00 <br /> 4 Miscellaneous Removals LS 1.0 $ 20,000.00 S 20,000.00 <br /> 5 Common Excavation m3 12,500.0 $ 7.00 $ 87,500.00 <br /> 6 Soil Correction m3 1,800.0 $ 12.00 S 21,600.00 <br /> 7 Select Granular Base (300 mm) m3 3,350.0 $ 16.00 S 53,600.00 <br /> 8 Aggregate Base CL 5 (300 mm) m3 3,350.0 $ 18.00 S 60,300.00 <br /> 9 Bituminous Base Course (50 mm) t 1,200.0 $ 26.50 S 31,800.00 <br /> 10 Bituminous Binder Course (50 mm) t 1,200.0 $ 26.50 S 31,800.00 <br /> . 11 Bituminous Wear Course (50 mm) t 1,200.0 $ 29.00 S 34,800.00 <br /> 12 Concrete Curb and Gutter (B618) m 1,850.0 $ 22.00 S 40,700.00 <br /> 13 Traffic Control LS 1.0 $ 100,000.00 S 100,000.00 <br /> 14 Signage and Striping LS 1.0 $ 15,000.00 S 15,000.00 <br /> 15 Modular Block Retaining Wall m2 80.0 $ 270.00 S 21,600.00 <br /> 16 TCAAP Wellhead Modification LS 1.0 $ 15,000.00 S 15,000.00 <br /> 17 Seeding ha 1.0 $ 5,000.00 S 5,000.00 <br /> 18 Sodding m2 3,500.0 $ 3.50 S 12,250.00 <br /> 10% Contingency $ 59,400.00 <br /> SUBTOTAL $ 653,475.00 <br /> 26% Indirect Cost and Capitalized Interest $ ] 69,900.00 <br /> Total Estimated Project Cost - Roadway Alternative A $ 823,375.00 <br /> . <br />