My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-13-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 10-13-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:32 PM
Creation date
11/10/2006 4:47:49 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> . City of Arden Hills <br /> 1999 Street Improvements Project <br /> West Round Lake Road Phase 2 <br /> WATERMAIN IMPROVEMENTS <br /> Unit <br /> No. Item Unit Ouantitv Price Extension <br /> 1 Mobilization LS 1.0 $ 8,700.00 $ 8,700.00 <br /> 2 Abandon 200 mm Watermain LS 1.0 $ 5,000.00 $ 5,000.00 <br /> 3 Connect to Existing Watermain EA 3.0 S 2,000.00 $ 6,000.00 <br /> 4 200 mm DIP CL 52 m 30.0 S 100.00 $ 3,000.00 <br /> 5 300 mm DIP CL 52 m 760.0 S 150.00 $ 114,000.00 <br /> 6 200 mm Gate Valve EA 4.0 S 1,500.00 S 6,000.00 <br /> 7 300 mm Gate Valve EA 5.0 $ 2,000.00 S 10,000.00 <br /> 8 Hydrant and Gate Valve EA 7.0 $ 1,500.00 S 10,500.00 <br /> 9 DIP fittings k" 2,100.0 $ 1.50 S 3,150.00 <br /> b <br /> . 10% Contingency S 16,600.00 <br /> SUBTOTAL $ 182,950.00 <br /> 26% Indirect Cost and Capitalized Interest $ 47,600.00 <br /> Total Estimated Project Cost - Watermain Improvements $ 230,550.00 <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.