Laserfiche WebLink
<br /> . City of Arden Hills <br /> 1999 Street Improvements Project <br /> West Round Lake Road Phase 2 <br /> Alternative Cl <br /> STORM DRAINAGE IMPROVEMENTS <br /> Unit <br /> No. Item Unit Ouantitv Price Extension <br /> 1 Mobilization LS 1.0 $ 9,800.00 $ 9,800.00 <br /> 2 Connect to Existing Storm Sewer EA 1.0 $ 1,500.00 $ 1,500.00 <br /> 3 375 mm RCP m 160.0 $ 85.00 $ 13,600.00 <br /> 4 525 mm RCP m 90.0 $ 120.00 $ 10,800.00 <br /> 5 600 mm RCP m 90.0 $ 138.00 $ 12,420.00 <br /> 6 675 mm RCP m 90.0 $ 156.00 $ 14,040,00 <br /> 7 750 mm RCP m 90.0 $ 175.00 $ 15,750.00 <br /> 8 825 mm RCP m 70.0 $ 195.00 S 13,650,00 <br /> 9 900 mm RCP m 110.0 $ 195.00 S 21,450,00 <br /> . 10 100 mm Perferated Drain Pipe m 560.0 S 25.00 $ 14,000,00 <br /> 11 Catch Basin (600 mm x 900 mm) EA 7.0 S 1,200.00 $ 8,400,00 <br /> 12 Manhole Catch Basin (1.3 m) EA 21.0 S 2,500.00 $ 52,500,00 <br /> 10% Contingency $ 18,800,00 <br /> SUBTOTAL $ 206,710.00 <br /> 26% Indirect Cost and Capitalized Interest $ 53,700.00 <br /> Total Estimated Project Cost - Storm Drainage AIL Cl $ 260,410,00 <br /> . <br /> --- - <br />