My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-16-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 03-16-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:38 PM
Creation date
11/10/2006 4:48:21 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I Project Budget Costs <br /> ,- <br /> Budget level construction costs have been estimated in order to provide a relative comparison <br /> between each of the four layouts described in the report. The estimated costs only address major <br /> I project items such as signal systems, turn lane construction, roadway/frontage road extensions, <br /> access ramps, retaining walls. Costs for the through lane construction of Highway 96 have not <br /> been included since they would be the same in all layouts. Costs for other standard items <br /> I including lighting, storm drainage and traffic control have not been included for the same reason <br /> as the mainline. The costs associated with bridge construction on Highway 10 would be nearly <br /> identical for layouts #2, #3, and #4 and have not been included in the comparison. <br /> I The following is a summary of comparison costs for each of the four layouts. Further <br /> breakdowns of the costs are included in the appendix. <br /> I Layout #1: At-Grade Intersection <br /> Estimated Budget Comparison Cost $710,000.00 <br /> I <br /> Layout #2: Grade Separated Interchange, North Access <br /> I Estimated Budget Comparison Cost $747,250.00 <br /> -- Layout #3: Grade Separated Interchange, North and South Access <br /> Estimated Budget Comparison Cost $1,498,500.00 <br /> I Layout #4: Grade Separated Interchange, No Access <br /> Estimated Budget Comparison Cost $305,000.00 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> , 16 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.