Laserfiche WebLink
<br /> I <br /> I Project Budget Costs <br /> ,- <br /> Budget level construction costs have been estimated in order to provide a relative comparison <br /> between each of the four layouts described in the report. The estimated costs only address major <br /> I project items such as signal systems, turn lane construction, roadway/frontage road extensions, <br /> access ramps, retaining walls. Costs for the through lane construction of Highway 96 have not <br /> been included since they would be the same in all layouts. Costs for other standard items <br /> I including lighting, storm drainage and traffic control have not been included for the same reason <br /> as the mainline. The costs associated with bridge construction on Highway 10 would be nearly <br /> identical for layouts #2, #3, and #4 and have not been included in the comparison. <br /> I The following is a summary of comparison costs for each of the four layouts. Further <br /> breakdowns of the costs are included in the appendix. <br /> I Layout #1: At-Grade Intersection <br /> Estimated Budget Comparison Cost $710,000.00 <br /> I <br /> Layout #2: Grade Separated Interchange, North Access <br /> I Estimated Budget Comparison Cost $747,250.00 <br /> -- Layout #3: Grade Separated Interchange, North and South Access <br /> Estimated Budget Comparison Cost $1,498,500.00 <br /> I Layout #4: Grade Separated Interchange, No Access <br /> Estimated Budget Comparison Cost $305,000.00 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> , 16 <br /> I <br />