My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-08-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 06-08-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:46 PM
Creation date
11/10/2006 4:48:52 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ( <br />HIGHWAY 96 PLAN RECOMMENDA nON PAGE 2 JUNE 4, 1998 . <br />4. Signalization ofthe new Round Lake Road at Highway 96 intersection There <br /> appeared to be some question at the May 26, 1998 meeting whether or not the <br /> intersection needs to be signalized. With the development occurring within the <br /> Gateway area, it is essential that this intersection be signalized now. <br />5. Determination of the cost participation hetween Arden Hills and Ramsey County <br /> for land acquisition and construction of the new Round T .ake Road/Highway 96 <br /> connection The County has verbally indicated that it will pay for a percentage of <br /> the improvements and acquisition of this area. The City has finally obtained the <br /> appraisal for the property and begun design work on the new intersection. <br /> However, the County has not yet committed to a funding level after these costs <br /> were prepared. <br />6. Relocation of the pedestrian walking trail currently proposed on the south side of <br /> Highway 96 The County still has not responded to the City's desire to relocate <br /> the trail away from the 1-35W bridge. <br />7. Determination of the cost participation on the T-15W and Highway lO hridges ~ <br /> hetween MnDOT, Ramsey County and local municipalities The City has not <br /> received cost estimates indicating expected costs to the City, if any, for the <br /> construction of these bridges or the necessary ramps and connections. <br />8. Ramsey COlmty coordinate a meeting with the City of New Brighton, City of <br /> Arden Hills, Ramsey County and MnDOT to review the plan Staff would like to <br /> hear from all parties as to their expectations for the project, including cost <br /> participation. <br />9. Development of a new schedule for the Project The County has not revised its <br /> schedule for construction. With the Round Lake improvements taking place, it is <br /> imperative that a new schedule be agreed upon and followed. <br />Recommen dation <br />City staff and the City engineer recommend approval of Resolution #98-43, "Approving <br />Preliminary Plan for the Reconstruction of Highway 96 between Old Highway 8 and Highway <br />10," subject to Ramsey County addressing the nine (9) areas of concern identified above. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.