Laserfiche WebLink
<br /> ARDEN HILLS CITY COUNCIL - MAY 26. 1998 11 <br />. Councilmember Aplikowski suggested that "RV" be spelled out in lower case letters to clarify <br /> what. is included in this generic definition. Councilmember Malone agreed with this suggestion <br /> and accepted this as a friendly amendment to the motion. <br /> The motion carried unanimously (5-0). <br /> B. Viking Sprinkler Request for Reduction of Permit Fees <br /> Lisa Bossert, representing Viking Automatic Sprinkler Company, advised they are installing <br /> high pressure sprinkling systems in three buildings under construction. She explained the <br /> sprinkling system can claim to actually suppress a fire (not just control the fire) and in order to <br /> make that claim, the quantity of sprinkler heads is abnormally high. They will also provide fire <br /> pumps which are not required with a typical sprinkler system. She presented site drawings of <br /> these buildings, noting the large number of sprinkler system heads. Ms. Bossert stated these will <br /> be easy buildings to inspect based on the symmetry of the structure. <br /> Ms. Bossert explained the City's permit fee is $15 for first sprinkler and $2.50 for each <br /> additional sprinkler beyond that. She asserted this fee structure is uncommon compared to other <br /> cities which charge for the first sprinkler and then for each ten additional sprinklers (not per <br /> sprinkler). She explained they estimated this job based on that fee schedule. Ms, Bossert noted <br /> the permit fees for these buildings exceeds $8,300 which she believes is excessive given the level <br /> of effort to do the inspections. <br />. Councilmember Malone stated he would like City Staff to have the opportunity to present their <br /> recommendation, He asked what other cities charge for each additional 10 sprinklers. Ms. <br /> Bossert stated in White Bear Lake it would cost $1,000 and in Blaine it would cost $2,000 but no <br /> where would it cost $8,000. <br /> Ms. Bossert stated the City's fee structure may be appropriate for small structures but may not be <br /> appropriate for this type of structure. She explained they do a design/build with a flat rate price <br /> including the permit and a full Code compliance. <br /> Councilmember Hicks asked if this system requires more heads than other systems on a square <br /> footage basis. Ms. Bossert stated this is correct and noted one building has 1,300 sprinkler <br /> heads, the second building has 800 sprinkler heads, and the third building has about 1,000 <br /> sprinkler heads. <br /> Mayor Probst asked if Viking Automatic Sprinkler Company has done work in Arden Hills <br /> previously. Ms. Bossert stated they have. Mayor Probst stated, theoretically, they should have <br /> known of the City's fee structure. Ms. Bossert stated this is correct but the estimator used the <br /> more typical fee structure used by other cities. <br /> Ms. Bossert presented permit applications used by other cities that charge for the first sprinkler <br /> head and then for each ten additional sprinkler heads. <br />. Mayor Probst asked if the Council would like a recommendation from Staff to consider at the <br /> next Council meeting. <br /> I <br />