My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-29-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 06-29-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:48 PM
Creation date
11/10/2006 4:49:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> EXHIBIT A - Continued <br /> RenewaIProposal- Investment for the Future . <br />Meredith Cable proposes to meet the needs of the North Suburbs with this investment plan for the <br />future which will thoroughly revitalize and modernize the system. This plan includes a franchise <br />commitment to develop the system to 750 MHZ capacity. This plan will result in higher quality <br />signals, expanded channel capacity and the opportunity to launch new programming services. In <br />addition, Meredith Cable proposes to upgrade the existing Institutional Network and incorporate <br />fiber into the system to facilitate future expansion of the Institutional Network. Meredith Cable <br />also proposes a renewal of our commitment to support of local access programming and the <br />establishment of capability to enable the development of future high speed data transmission <br />services and other future services. This proposal represents an aggressive effort to respond to <br />identified community needs and interests, taking into account the cost of meeting those needs and <br />interests over the requested fifteen (15) year renewal time frame. The specifics of the proposal <br />are set forth below: <br />A. SUBSCRIBER SYSTEM UPGRADE DESIGN AND CONSTRUCTION <br />Meredith Cable will commit in a renewal franchise that the subscriber system serving the North <br />Suburbs will be enhanced from the current 450 MHZ, 65 channel system. to a state-of-the-art 750 <br />MHZ system offering dramatically more channel capacity, higher signal quality, more reliability <br />and more features as set forth below: . <br />. A-I. The subscriber network will be 750 MHZ capacity. Meredith plans to initially <br /> program 81 downstream channels upon activation - with phased activation launches as <br /> nodes are completed. This leaves an additional 200 l'vIHZ capacity available for future <br /> activation of additional video channels, digital services, and other services as future <br /> marketplace needs dictate. In addition, the system will be designed with the capability to <br /> transmit return signals upstream at 5 - 40 MHZ in the future as commercial need dictates <br /> and with mutually acceptable franchise language that establishes a mechanism for <br /> discussions regarding activation of the return. <br />. A - 2. Hybrid fiber-coaxial architecture will be deployed. <br />. A - 3. Initially, the system will be developed with approximately Forty (40) pockets which <br /> are called "nodes", each connected by optical fiber and serving approximately Two <br /> Thousand (2000) homes with a minimum 16 fiber count. The fiber optic nodes will be <br /> designed to be capable of migrating to five hundred (500) home nodes with a minimum 4 <br /> fiber count as marketplace need dictates. <br />. A - 4. All power supplies will be equipped with standby power capability which, at a <br /> minimum, will be initially activated at the node locations. <br />. A - 5. In order to better assure reliability and system maintenance, the system will . <br />
The URL can be used to link to this page
Your browser does not support the video tag.