My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-29-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 06-29-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:48 PM
Creation date
11/10/2006 4:49:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> City of Arden Hills <br /> AET Proposal No. 3-98-138 . <br /> June 10, 1998 <br /> Page 2 <br /> . Identification of transformers , capacitors, light ballasts or other potential PCB containing <br /> equipment. <br /> . Locate and sample, where accessible, thermal, acoustical, fire proofing or other suspect <br /> asbestos containing materials (ACM). <br /> . Analyze the suspect ACM samples for asbestos content. <br /> . Assess the condition of any confirmed ACM and estimate the quantities of confirmed <br /> asbestos within the building. <br /> . Preparation of a written report. <br /> Client Responsibilities . <br /> The Client shall provide AET with access to the building. <br /> Performance Schedule <br /> We will complete this project and deliver the report to you within two weeks of receiving <br /> authorization to proceed unless we are delayed by the regulatory agency database review. We will <br /> notify you should this occur to reschedule the completion date. <br /> This proposal is valid for a period of 90 days from the date issued. <br /> Conditions <br /> The attached Service Agreement applies to this project. <br /> Fees <br /> Our fees for services will be charged on a time and materials basis in accordance with our current <br /> schedule of fees, which is attached. For the scope of services described above, the cost will not <br /> exceed $800.00 without prior written approval. The cost includes analysis of up to 20 suspect <br /> ACM samples for asbestos. Additional suspect ACM samples, if required, will be analyzed at an <br /> additional cost of $25.00 per sample. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.