My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-26 EDC Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
2026
>
05-27-26 EDC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 8:20:42 AM
Creation date
5/19/2026 8:20:27 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Monument Sign Concept One <br />Estimated Construction Cost <br />By: SF <br />Item Description QTY ESTIMATED <br />COST <br />1 Mobilization 1 $ 9,200 <br />2 Earthwork and erosion control 1 $ 25,500 <br />3 <br />40' long by 10' high masonry monument sign <br />including central wall with veneer on front face only, <br />sign lettering, lighting of lettering <br />1 $ 110,000 <br />4 Electrical service 1 $ 15,000 <br />5 Sodding 1500 $ 12,000 <br />6 Concrete edging 215 $ 6,450 <br />7 Tree, shrub and perennial planting 1 $ 15,000 <br />Subtotal $ 193,150 <br />Recommended Contingency (20%) $ 38,630 <br />Estimated Design through Construction <br />Administration (15%) $ 28,973 <br />Estimated Total $ 260,753 <br />RED.1 <br />RED.2 <br />ADD.1 Monument Sign Wing Walls with veneer on front face <br />only 1 $ 63,000 <br />ADD.2 Uplighting 1 $ 10,000 <br />ADD.3 Irrigation System 1 $ 15,000 <br />Note: <br />WSB Project #010661-000 <br />December 14th, 2017 <br />This estimate is based on concept planning level design work for the purpose <br />of budgeting. It should be anticipated that cost the estimate will need to be <br />refined as the design progresses with greater detail. <br />Base Items <br />Potential Add-On Items <br />Potential Cost Reduction Items <br />Replace stone veneer with simulated stone pattern concrete wall resulting in a <br />cost reduction of $16,000. <br />Reduce size of sign wall to 22' long by 10' high and replace stone veneer with <br />simulated stone pattern concrete wall resulting in a cost reduction of $46,600. <br />12/14/2017 K:\010661-000\Quantity\Preliminary\010661-000 City Monument Sign at Hwy 96 & Lexington
The URL can be used to link to this page
Your browser does not support the video tag.