Laserfiche WebLink
<br /> AUG-14-1998 10'27 BRW 612 370 1378 P.02/03 <br /> 1999 STREET MAINTENANCE PROGRAM POLICY <br />. DISCUSSION POINTS <br /> ARDEN HILLS CITY COUNCIL WORKSESSION <br /> MONDAY,AUGUST 17, 1998 <br /> I. Fadors for Consideration Whcn RatinglRanking Infrastructure <br /> A. Pavement Analysis Methodology <br /> - PCI rating system, frequency of field reviews <br /> - Roadway age, maintenance history <br /> - Software systems, manual decision charts <br /> B. Utility Condition <br />. Watermaln age, material, maintenance history, capacity for future needs <br /> - Sanitary Sewer age, material, televising results, maintena.!lCe history <br /> C. Storm Drainage <br /> - Problem drainage areas, collection system, curb and glitter status <br /> - Water quality improvements, ponding grit chambers, stilling basins, cte, <br /> D. Roadway Classification <br /> - Level of traffic, state aid status, parkway designation <br /> E_ PedestrianIN eighborhood Considerations <br /> - Sidewalks, trails or on road bike lanes desired <br /> - Traffic calming measures desired <br /> F. Citywide Basemapping <br /> IncOlporation of street data into GIS system <br /> Incorporation of utility data into GIS system <br /> - Incorporation of maintenance data into GIS system <br /> - Physical mapping of public/privale utilities into GIS system <br />. <br /> PAGE 1 OF 2 <br /> ...... - <br /> ~- <br />