My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-10-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 08-10-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:51 PM
Creation date
11/10/2006 4:49:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> APPLICATION FOR PARTIAL PAYMENT <br /> CITY OF ARDEN HILLS 1998 STREET RECONSTRUCTION <br /> AND MAINTENANCE IMPROVEMENTS <br /> . File: 37951-003-8001 8/05/98 <br /> Page: 5 <br /> 0[. No/ Unit Contract Contract To Date To Date <br /> Dot No Item Unit Price Quantity Amount Quantity Arn01..:_"1t <br /> -----~ ------------------------ ------- ---------- --------- ----------- --------- ----------- <br /> 8 STREET SWEEPER (WITH HR 75.00 5.00 375.00 0.00 c.oe <br /> 23.601 PICKUP BROOM) <br /> Subtotal: $ 6,879.6C <br /> d Schedule: D - STOWE AV RECONST (CITY NON-PART/ARDEN HILLS) <br /> 1 MOBILIZATION LS 30000.00 0.15 4500.00 0.10 3000.0: <br /> 21.501 <br /> 2 FIELD OFFICE TYPE D EA 4000.00 0.15 600.00 0.10 400.0C <br /> 31. 501 <br /> 3 SAWCUT BITUMINOUS m 8.50 55.00 467.50 0.00 O.OC <br /> J4.513 PAVEMENT (FULL DEPTH) <br /> 4 REMOVE BITUMINOUS m2 1. 00 1950.00 1950.00 1950.00 195C.OC <br /> )4.503 PAVEMENT <br /> _ REMOVE DRIVEWAY PAVEMENT m2 1. 00 l45.00 l45.00 145.00 14S.0C <br /> )4. 5 (CONCRETE) <br /> 6 REMOVE DRIVEWAY PAVEMENT m2 1. 00 335.00 335.00 335.00 335.0C <br /> )4.523 (BITUMINOUS) <br /> 7 SALVAGE SIGNS AND POSTS EA 25.00 7.00 175.00 7.00 175.QC <br /> )4.523 <br /> 8 SALVAGE MAILBOX EA 25.00 11. 00 275.00 11.00 27S.0C <br /> )4.523 <br /> 9 COMMON EXCAVATION (P) m3 5.50 1750.00 9625.00 1750.00 9625.0C <br /> 15.501 <br /> l.0 SELECT G?~ BORROW m3 9.70 630.00 6111. 00 630.00 61E.OC <br /> )5.522 (CV) <br /> ~1 AGGREGAT~ BASE CLASS V, m3 19.75 550.00 10862.50 602.00 l1869.75 <br /> ~1.502 100% CRUSHED LIMEROCK <br /> c2 CONCRETE DRIVEWAY APRON m2 32.62 150.00 4893.00 0.00 C.OC <br /> ll.503 <br /> C3 TYPE 41 WEARING COURSE t 27.40 205.00 5617.00 0.00 c.oe <br /> 31. MIXTURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.