Laserfiche WebLink
<br /> APPLICATION FOR PARTIAL PAYMENT <br /> CITY OF ARDEN HILLS 1998 STREET RECONSTRUCTION <br /> AND MAINTENANCE IMPROVEMENTS <br /> . File: 37951-003-8001 8/05/98 <br /> Page: 7 <br /> 'q. No/ Unit Contract Contract To Date To Date <br /> 1Dot No Item Unit Price Quantity Amount Quantity Amount <br /> - - - - - -- ------------------------ ------- ---------- --------- ----------- --------- ----------- <br /> 29 F&I SIGN PANEL TYPE C m2 200.00 3.50 700.00 0.00 O.OC <br /> i64.531 <br /> 30 100mm BROKEN LINE YELLOW- m 8.00 200.00 1600.00. 0.00 O.OC <br /> i64.603 EPOXY <br /> 31 BALE CHECKS EA 6.00 10.00 60.00 0.00 O. DC <br /> 'i73.501 <br /> 32 SODDING, TYPE LAWN WITH m2 3.00 1620.00 4860.00 0.00 a.Oc. <br /> 575.502 4" TOPSOIL <br /> Subtotal: $ ';'5,785.35 <br /> cd Schedule: E - FAIRVIEW AVENUE RECONSTRUCTION <br /> 1 MOBILIZATION LS 30000.00 0.20 6000.00 0.05 1500.0C <br /> 121. 501 <br /> tit FIELD OFFICE TYPE D EA 4000.00 0.20 800.00 0.05 200.0C <br /> 13 . 01 <br /> 3 SAWCUT BITUMINOUS m 8.50 52.00 442.00 0.00 O.OC <br /> .04.513 PAVEMENT (FULL DEPTH) <br /> 4 SAWCUT CONCRETE PAVEMENT m 11.50 80.00 920.00 0.00 a.DC <br /> .04.511 (FULL DEPTH) <br /> 5 REMOVE BITUMINOUS m2 1. 00 3900.00 3900.00 3900.00 39CO.OC <br /> _40.511 PAVEMENT <br /> 6 REMOVE DRIVEWAY PAVEMENT m2 1. 00 405.00 405.00 405.00 4C5.0C <br /> ~04. 505 (CONCRETE) <br /> 7 REMOVE DRIVEWAY PAVEMENT m2 1. 00 265.00 265.00 265.00 263.0: <br /> '04.503 (BITUMINOUS) <br /> 8 SALVAGE SIGNS AND POSTS EA 25.00 16.00 400.00 16.00 4CO.OC <br /> _04.523 <br /> 9 SALVAGE MAILBOX EA 25.00 12.00 300.00 12.00 30.0C. <br /> ~04.523 <br /> 10 COMMON EXCAVATION (p) m3 5.50 3610.00 19855.00 3610.00 19853.0C <br /> i.l <br />