Laserfiche WebLink
<br /> APPLICATION FOR PARTIAL PAYMENT <br /> CITY OF ARDEN HILLS 1998 STREET RECONSTRUCTION <br /> AND MAINTENANCE IMPROVEMENTS <br /> BRW File: 37951-003-8001 8/05/98. <br /> Page: 14 <br /> 'g. No/ Unit Contract Contract To Date To Date <br /> lDot No Item Unit Price Quantity Amount Quantity Amount <br /> .------ ------------------------ ------- ---------- --------- ----------- --------- ----------- <br /> 11 BITUMINOUS MATERIAL FOR L 0.40 575.00 230.00 0.00 0.0: <br /> '57.502 TACK COAT <br /> 12 100mm HPDE OR PVC m 25.30 40.00 1012.00 0.00 0.0: <br /> ,03.541 SUBDRAIN <br /> 13 CONSTRUCT CATCH BASIN EA 997.50 1. 00 997.50 0.00 0.0: <br /> i06.507 (610mm X 914mm) <br /> 14 CONSTRUCT MANHOLE CATCH EA 1155.00 1. 00 1155.00 0.00 0.0: <br /> ;06.507 BASIN (1200mm) <br /> 15 CONNECT TO EXISTING STORM EA 157.50 1.00 157.50 0.00 0.0: <br /> '06.602 SEWER <br /> 16 FURNISH AND INSTALL EA 150.00 1.00 150.00 0.00 . 0.0: <br /> .06.602 INFILTRATION SHIELD <br /> n CONCRETE CURB AND GUTTER m 20.90 110.00 2299.00 0.00 0.0. <br /> ;31.501 DESIGN B618 <br /> 18 TRAFFIC CONTROL LS 4000.00 0.10 400.00 0.00 0.0: <br /> 63.604 <br /> Subtotal: $ 3,675.0:' <br /> d Schedule: J - NORTH HAMLINE CULVERT REPAIR <br /> 1 MOBILIZATION LS 30000.00 0.05 1500.00 0.00 0.0: <br /> 21.501 <br /> 2 FIELD OFFICE TYPE D EA 4000.00 0.05 200.00 0.00 0.0: <br /> '31.501 <br /> 3 REMOVE BITUMINOUS m2 1. 00 54.00 54.00 0.00 0.0: <br /> _04.503 PAVEMENT <br /> 4 REMOVE CMP PIPE CULVERTS m 21.00 18.00 378.00 0.00 0.0: <br /> .04.521 <br /> 5 COMMON EXCAVATION (P) m3 5.50 100.00 550.00 0.00 0.0: <br /> .05.501 <br /> 6 SELECT GRANULAR BORROW m3 9.70 8.00 77.60 0.00 0.0: <br /> _05.522 (CV) . <br /> ----.------ <br />