Laserfiche WebLink
<br />.. <br />DRAFT <br />ARDEN HILLS CITY COUNCIL WORKSESSION - AUllust 17. 1998 2 <br /> . <br />Plan update; City costs for demolition of blighted property; increase in the I-35W Corridor <br />Coalition involvement; the impact of TCAAP planning activities and Phase II re-use plan <br />funding opportunities; interim funding options to study TCAAP infrastructure; stress on existing <br />enterprise fund balances with proposed residential water meter replacements and sanitary sewer <br />capital costs; the pursuit of water and sewer services to existing facilities at TCAAP; proposed <br />City operation ofTCAAP's existing water plant facility; and the increasing list of TCAAP- <br />related items and with no identified resources to pursue them. <br />Mr. Fritsinger stated that the estimated $300,000 in consulting fees for Phase II TCAAP planning <br />was the figure provided by Camiro's in 1994, and staff had not yet examined the methodology to <br />define exactly the scope of what those proposed fees included. <br />Mr. Post reviewed several suggested modifications to the adopted 1998 budget including the <br />temporary City Hall lease; Cleveland Avenue railroad bridge construction; and new City Hall <br />construction. <br />Mr. Post referred to schedules that indicated a six-year historical look at expenditures, revenues, <br />and proposed levy limits and property tax collections; assumption of a 2.5% delinquency on <br />property tax revenues in 1999; reduction in sale of fixed assets; 1999 election department budget <br />decrease; increase in Administrative Office which was basically salary driven and due to re- <br />allocations; government buildings review; Ramsey County Sheriffs Department; Lake Johanna . <br />Volunteer Fire Department; and proposed operating transfers out. <br />Mr. Post advised Councilmembers that this first draft of the General Fund expenditures and <br />revenues would be followed by the individual funds, which would be provided to the Council in <br />the near future. <br />Mayor Probst summarized that, based on a maximum permitted levy of 3 .2%, the proposed 1999 <br />budget was in balance, with two notable areas: an approximate 25% reduction in the Pavement <br />Management Program (PMP); and a lack of identified funding for TCAAP Phase II planning <br />activities. <br />Councilmembers noted that, even with a reduction in the street maintenance budget in 1999, <br />funding was included to allow $30,000 for sealcoating projects; and $151,000 for the PMP <br />specifically for the West Round Lake Road reconstruction, but that no funding was available for <br />neighborhood street maintenance projects under current funding levels. Further discussion took <br />place regarding whether additional neighborhood projects could be accommodated in the 1999 <br />budget, and specifically what those projects should entail. <br />It was determined that the Council should, prior to giving direction to staff, hear consulting <br />engineer, Greg Brown's, suggestions for revisions to the City's PMP and how these suggestions <br />might impact the 1999 budget, as well as TCAAP Phase II planning. . <br />