My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:53 PM
Creation date
11/10/2006 4:49:24 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> --- <br /> ~c\D\~ B \ <br /> . <br /> COMPANIES 8651 NAPLES ST. N.E. . BLAINE, MN 55449 . (612) 784-0657 <br /> To: Welsh Construction Co" Inc, 8/20/98 <br /> 8200 Normandale Boulevard, Suite 200 <br /> Minneapolis, MN 55437-1060 <br /> Attention: Jim Todd <br /> 1 <br /> Reference: Gateway Center, Arden Hills <br /> Soils Correction Pricing <br /> As requested by the City of Arden Hills and Welsh Construction we would like to <br /> submit verification of soil correction quantities and pricing concerning the above <br /> referenced project. We are presenting the previously submitted spreadsheet and our <br /> project diary for Gateway Center from the beginning of the job through May 15th 1998, <br /> Some diary entries for a job called American Express have also been included as the . <br /> loading and material costs are relevant to this project <br /> As discussed in previous conversations the basis upon which this project was <br /> priced was lump sum. The soils correction pricing was included in this price, Because the <br /> quantity of soils correction was included in the lump sum price we were not required to <br /> keep accurate record of the correction unless it was more than the bid quantity, We have <br /> not attempted to arrive at an exact quantity of soil correction as this would be extremely <br /> difficult at this time. <br /> Our records sbow a considerable amount more soil correction tban was included <br /> initially, This extra soils correction bas been submitted to Welsb Construction for <br /> inclusion into our contract All required soil correction was done at tbe discretion of the <br /> soils engineer. <br /> We also submitted to you billing from a subcontractor for trucking off-site of <br /> unsuitable materials, Tbis bill included a larger quantity of material tban we claimed on <br /> our spreadsbeet because some oftbe material trucked off-site was not considered soil <br /> correction. Also tbis subcontractor unit price billing was less tban the unit price shown on <br /> the spreadsheet as we did add our own overhead to tbe spreadsbeet price. <br /> In addition to tbe subcontractor bill for tbe removal of unsuitable material we also <br /> submitted to you our own truck tickets sbowing the trucking off from tbe site of . <br /> ., <br /> , <br /> , <br /> I -- -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.