My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:53 PM
Creation date
11/10/2006 4:49:24 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> AS <br /> COMPANIES 8651 NAPLES ST. N.E. . BLAINE, MN 55449 . (612) 784-0657 <br /> To: Welsh Construction 7/8/98 <br /> 8200 Normandale Boulevard, Suite 200 <br /> Minneapolis, MN 55437 <br /> Attention: Jim Todd <br /> Reference: Gateway Project Arden Hills, Minnesota <br /> We have put together most of the trucking records received from your job to help <br /> with the verification of soil correction quantities, Although our records show almost <br /> 45,000 cubic yards hauled out and 27,000 cubic yards hauled in approximately 16,200 <br /> cubic yards was required for soils correction, On the report accompanying this letter <br /> items 1 through 8 reflect the off-site disposal and the import from off-site of material from <br /> below subgrade elevations, Item 9 was soil correction performed using material disposed <br /> . of and obtained from on site areas, Item 10 reflects the drying of the in-place subgrade, If <br /> you have any questions please feel free to give me a call. The quantities are inclusive of <br /> material moved prior to May 15th <br /> Sincerely, <br /> f)Jr~ <br /> Dick Travis <br /> Project Coordinator <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.