Laserfiche WebLink
<br /> . PROJECT COSTS/PROJECT FUNDING <br /> Preliminary construction cost estimates have been prepared for the proposed project. Project <br /> Costs shown below include a 10% contingency cost and 26% for administrative costs. <br /> Administrative costs include engineering, planning, legal, fiscal, and city staff expenses. The <br /> following is a summary of the estimated project costs: <br /> Improvements Estimated Cost <br /> Roadway Improvements* $ 400,290.00 <br /> Watermain/Sanitary Sewer Improvements $ 87,650.00 <br /> Storm Drainage Improvements $ 237.100.00 <br /> Total Construction Cost $ 725,040.00 <br /> *includes temporary signal and trail <br /> Land ACQuisition Costs <br /> The project costs shown above do not include any costs associated with land acquisition or <br /> condemnation of the Indykiewicz property. The city is currently negotiating with the <br /> property owner for the acquisition of the parcel. Any costs associated with land acquisition, <br /> structure demolition and relocation of personal property (i.e. black dirt stockpiles) will be <br /> resolved as a part of the ongoing negotiation/condemnation process. <br /> . Ramsev County Cost Particination <br /> A significant portion of costs associated with the roadway improvements and storm drainage <br /> improvements will be reimbursed to the City by Ramsey County as a part of the Highway 96 <br /> reconstruction project. Based upon discussions with Ramsey County staff, costs for the <br /> construction of a roadway equivalent to the existing roadway would be borne by the County. <br /> This report includes a separate estimate of the roadway costs to be reimbursed by the County. <br /> The County will not participate in any costs associated with the temporary signal, concrete <br /> curb and gutter, sidewalk or bituminous trail. In addition, the County will participate in the <br /> storm sewer costs to the extent that the piping and ponding improvements serve Highway 96. <br /> It is estimated that approximately 60% of the tributary drainage area entering the pond is <br /> from County right of way, therefore Ramsey County should reimburse the City for 60% of <br /> storm drainage costs. a final determination of storm drainage cost participation will be made <br /> once final design of the Highway 96 improvements is sufficiently complete to verify <br /> tributary areas. <br /> The following is an estimate of the amount of Ramsey County funding participation in the <br /> project: <br /> Improvements Estimated Cost <br /> County Replacement Roadway $ 195,260.00 <br /> Stoml Drainage Improvements $ 142.260.00 <br /> Total Estimated Ramsey County Participation $ 337,520.00 <br /> . 5 <br />