Laserfiche WebLink
<br /> . City of Arden Hills <br /> West Round Lake Road <br /> Phase 1 <br /> WEST ROUND LAKE ROAD CONSTRUCTION <br /> Unit <br /> No. Item Unit Quantitv Price Extension <br /> 1 Mobilization LS 1.0 $ 12.700.00 $ 12,700.00 <br /> 2 Clearing and Grubbing ha 1.5 $ 5,000.00 $ 7.500.00 <br /> 3 Sawing Bituminous Pavement m 100.0 $ 15.00 $ 1,500.00 <br /> 4 Common Excavation m3 7,200.0 $ 7.00 $ 50,400.00 <br /> 5 Select Granular Base (300 mm) m3 1,700.0 $ 16.00 S 27,200.00 <br /> 6 Aggregate Base CL 5 (300 mm) m3 1,700.0 $ 18.00 $ 30,600.00 <br /> 7 Bituminous Base Course (50 mm) t 600.0 $ 26.50 $ 15,900.00 <br /> 8 Bituminous Binder Course (50 mm) t 600.0 $ 26.50 $ 15,900.00 <br /> 9 Bituminous Wear Course (50 mm) t 600.0 $ 29.00 S 17 ,400.00 <br /> 10 Concrete Curb and Gutter (B618) m 900.0 $ 22.00 S 19,800.00 <br /> II Temporary Signal System Sig. Sys. 1.0 $ 60,000.00 S 60,000.00 <br /> .12 75 mm Bituminous Walk m2 570.0 $ 17.00 $ 9,690.00 <br /> 13 Seeding ha 0.4 $ 5,000.00 $ 2,000.00 <br /> 14 Sodding m2 5.200.0 $ 3.50 $ 18,200.00 <br /> 10% Contingency $ 28,900.00 <br /> SUBTOTAL $ 317,690.00 <br /> 26% Indirect Cost and Capitalized Interest $ 82.600.00 <br /> West Round Lake Road <br /> Total Estimated Project Cost $ 400,290.00 <br /> "West Round Lake Road Construction" <br /> . <br />