My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:53 PM
Creation date
11/10/2006 4:49:24 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . City of Arden Hills <br /> West Round Lake Road <br /> Phase 1 <br /> STORM DRAINAGE IMPROVEMENTS <br /> Unit <br /> No. Item Unit Quantitv Price Extension <br /> 1 Mobilization LS 1.0 $ 9,000.00 $ 9,000.00 <br /> 2 Clearing and Grubbing ha 2.5 $ 5,000.00 $ 12,500.00 <br /> 3 375 mm RCP m 80.0 $ 85.00 $ 6,800.00 <br /> 4 900 mm RCP m 210.0 S 125.00 $ 26,250.00 <br /> 5 1200 mm RCP m 15.0 $ 150.00 $ 2,250.00 <br /> 6 Catch Basin (600 mm x 900 mm) EA 4.0 $ 1.200.00 $ 4,800.00 <br /> 7 Manhole Catch Basin (1.3 m) EA 11.0 $ 2,500.00 S 27.500.00 <br /> 8 1200 mm Pipe Apron EA 1.0 $ 2.500.00 $ 2,500.00 <br /> 9 525 mm Pipe Apron EA 2.0 $ 1.500.00 $ 3,000.00 <br /> 10 Control Outlet EA 1.0 $ 10,000.00 $ 10,000.00 <br /> 11 Rip Rap m3 20.0 $ 70.00 $ 1,400.00 <br /> e12 Pond Excavation m3 9,300.0 $ 7.00 $ 65,100.00 <br /> 10% Contingency $ 17,100.00 <br /> SUBTOTAL $ 188,200.00 <br /> 26% Indirect Cost and Capitalized Interest $ 48,900.00 <br /> West Round Lake Road <br /> Total Estimated Project Cost $ 237,100.00 <br /> "Storm Drainage Improvements" <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.