Laserfiche WebLink
<br /> City of Arden Hills . <br /> West Round Lake Road Phase 2 <br /> Enhancement Options <br /> Unit <br /> N2. I1= lInit Quantity fikl: Extension <br /> 1 Streetlight (includes wiring and panel)* EA 30.0 $ 3,500.00 $ 105,000.00 <br /> 2 Landscaping Tree EA 225.0 $ 300.00 $ 67,500.00 <br /> 3 Landscaping Shrub EA 500.0 $ 40.00 $ 20,000.00 <br /> 4 Irrigation System LS 1.0 $ 20,000.00 $ 20,000.00 <br /> 10% Contingency $ 19,300.00 <br /> SUBTOTAL $ 231,800.00 <br /> 2.6% Indirect Cost and Capitalized Interest $ 60,300.00 <br /> Total Estimated Project Cost - Enhancements $ 292,100.00 <br /> 'This item is based on smaller pedestrian fixtures in lieu of street type fixtures included in the original . <br /> feasibility report. The number of fixtures is greater to provide more consistent lighting for pedestrians. <br /> , <br /> . <br />