Laserfiche WebLink
<br /> ----------- <br /> h'TACI.l A. 1- <br />. B <br /> City of Arden Hills <br />. 1999 Street Improvements Project <br /> West Ronnd Lake Road Phase 2 <br /> Alternative D <br /> STORM DRAINAGE IMPROVEMENTS <br /> Unit <br /> & mm llni1 Quantity ~ Extension <br /> I Mobilization LS 1.0 $ 8,600.00 $ 8,600,00 <br /> 2 Connect to Existing Stonn Sewer EA 1.0 $ 1,500.00 $ 1,500.00 <br /> 3 375 nun RCP m 184.0 $ 85.00 $ 15,640.00 <br /> 4 525 nun RCP m 180.0 $ 120.00 $ 21,600.00 <br /> 5 600 nun RCP m 85.0 $ 138.00 $ 11,730.00 <br /> 6 675 nun RCP m 90.0 $ 156.00 $ 14,040.00 <br /> 7 750 nun RCP m 70.0 $ 175.00 $ 12,250.00 <br /> 8 825 nun RCP m 110.0 $ 195.00 $ 21,450.00 <br /> 9 100 nun Pederated Drain Pipe m 284.0 $ 25.00 $ 7,100.00 <br /> 10 Catch Basin (600 nun x 900 nun) EA 17.0 $ 1,200.00 $ 20,400.00 <br /> 11 Manho]e Catch Basin (1.3 m) EA ]7.0 $ 2,500.00 $ 42,500.00 <br />. 10% Contingency $ 17,700.00 <br /> SPBTOT.c\I. $ 194,510.00 <br /> 26% Indirect Cost and Capitalized Interest $ 50,600.00 <br /> Total Estimated Project Cost - Storm Drainage Alt. D $ 245,11 0.00 <br />. <br /> ----._--- --------- <br />