Laserfiche WebLink
<br /> <br /> FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br /> DEPARTMENT PROJECT TITLE PROJECT NUMBER FIVE-YEAR COST <br /> Public Works Power Equipment - 303-00 $3,000 <br /> Gas Pipe Saw & Water <br /> Pumps <br /> SCHEDULED PROJECT ACTIVITY <br /> FUNDING SOURCE 1999 2000 2001 2002 2003 FUTURE . <br /> Water and Sewer $3,000 <br /> Funds <br /> . <br /> LOCATION <br /> Maintenance Building, 1440 West Highway 96 <br /> DESCRIPTION <br /> Gas powered pipe saw and water pumps. Powered saw for cutting watermain, sewer pipe, blacktop <br /> and concrete. <br /> Water pump for sewer and water repairs and drainage problems. <br /> JUSTIFICATION <br /> All necessary equipment that is not used on a regular basis, but used heavily at times. <br /> CURRENTSTATUS~ROJECTEDSCHEDULE <br /> Current pumps are in good condition. . <br /> Pipe saw showing signs of wear. <br /> RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br /> Will be replaced only as needed. <br />