My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 12-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:04 PM
Creation date
11/10/2006 4:50:03 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> tt!~itjiljil~ii~jtltji~I~]111~~il~II~'lll1il~l~ttllll[tlt~r~1~11!i1illl~1II11[111'I~rt'~IIt.i'11{111*'4:j' <br /> FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br /> DEPARTMENT PROJECT TITLE PROJECT NUMBER FIVE-YEAR COST <br /> Public Works Ditch and Pond 482-99+ $175,000 <br /> Maintenance <br /> SCHEDULED PROJECT ACTIVITY <br /> FUNDING SOURCE 1999 2000 2001 2002 2003 FUTURE .' <br /> SWM Utility $50,000 $50,000 $25,000 $25,000 $25,000 <br /> LOCATION <br /> Various ditches identified in the Ditch Maintenance Plan <br /> DESCRIPTION <br /> Clean stormwater ditches, re-grade ditch bottoms and slopes, and haul out excess material. <br /> JUSTIFICATION <br /> Many areas of the City ditches are nearly overgrown with vegetation, causing water to leave the ditch <br /> banks and enter streets and private property during wet periods, <br /> CURRENTSTATUS~ROJECTEDSCHEDULE <br /> The ditches were studied in 1998 by the City Engineer and Public Works Director. <br /> RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br /> I <br /> Part of the Public Works plan to become more pro-active on infrastructure maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.