My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 12-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:04 PM
Creation date
11/10/2006 4:50:03 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. ,. <br />. <br /> 4 6" DIP Watermain LF $20,00 88 125 S2,500.00 <br />. 5 Hydrant with 6" Valve EA $2,200.00 5 2 S4,400.00 <br /> 7 12" Butterfly Valve EA $800,00 3 2 S 1 ,600.00 <br /> , <br /> Add 19 Welsh Construction Work LS $6,356.53 0 I S6,356.53 <br /> NET CHANGE S28,356.53 <br /> Original Quantit). Amount <br /> 1Iem Unit ' Contract Increase! Add! <br /> No. 1Iem Unit Price Quantity (Decrease) (Deduct) <br /> SCHEDULE 5.0 - SITEWORK <br /> 10 Pond Excavation CY $4.00 5,647 8,082 532,328.00 <br /> NET CHANGE S32,328.00 <br /> NETCHANGES~ARY <br /> SCHEDULE DEDUCT ADD <br /> 1.0 - Street S85,905.00 <br /> 2.0 - Storm Sewer S 18,28S.00 <br /> 3.0 - Sanitary Sewer SI8,090.00 <br /> 4.0 - Watermain S28,356.53 <br /> 5.0 - Sitework S32,32S.00 <br /> Subtotal SI81,085.53 <br /> TOTAL NET CHANGE SI82,973.53 <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.