My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-14-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 12-14-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:04 PM
Creation date
11/10/2006 4:50:03 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , <br /> 4(S . <br /> EXHIBIT "Au <br /> . <br /> 1997 FEE SCHEDULE FOR ELECTRICAL PERMITS . <br /> A) Minimum fee for each separate inspection of an installation. replacement. <br /> alteration or repairimited to one inspection only 522,00 <br /> B) Services, changes of service, temporary services, additions. altera:ions. or <br /> repairs on either primary or secondary services shall be compute: separately: <br /> o to 100 ampere capacity 525.00 <br /> 101 to and including 200 ampere capacity 530.00 <br /> For each additional 100 ampere capacity or fraction thereof 514.00 <br /> C) Circuits. installations of additions. alterations, or repairs of each circuit or sub- <br /> feeder shall be compu:ed separately. including circuits fed from su~-feeders and <br /> including the equipment served, except as provided for in (0) through (K): <br /> o to and including 30 ampere capacity 57.00 <br /> 31 to and including 100 ampere capacity 510,00 <br /> For each additional 100 ampere capacity of fraction thereof 55.00 <br /> D) Maximum fee on a single family dwelling shall not exceed $110.00 if not over <br /> 200 ampere capacity. This includes service, feeders. circuits. fixtures and <br /> equipment. The maximum fee provides for not more than two rough-in . <br /> inspections and the final inspection per dwelling, Additional inspections are at <br /> the reinspection rate. <br /> E) Maximum fee on an apartment building shall not exceed 550.00 per dwelling unit <br /> for the first 20 units and 545.00 per dwelling unit for the balance of the units. A <br /> two-unit dwelling. (duplex) maximum fee per unit as per single family dwelling. <br /> F) The maximum number of 0 to 30 ampere circuits to be paid on anyone athletic <br /> field lighting standard is ten. <br /> G) In addition to the above fees: <br /> 1) A charge of 53.00 will be made for each street lighting standard. <br /> 2) A charge of 54.00 will be made for each traffic signal standard, Circuits <br /> originating within the standardd will not be used when computing fees. <br /> H) In addition to the above fees. all transformers and generators for light, heat. and <br /> power shall be computed separately at S8.00 plus .40 per t<:VA up to and <br /> including 100 t<:VA. 101 t<:VA and over at .30 per Kl/A. The maximum fee for <br /> any transformer or generator in this category is S80.00. <br /> I . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.