Laserfiche WebLink
<br />. <br /> <br />-. <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />;=<w,..Q. , <br />4-L (\ ,I <br />rtC.'t...........i.v:.Ll'^-/ <br />1/1\ l''\'1 <br /> <br />llJ) I" l<::':.2C; S (<T/\ <br /> <br />West Round Lake Road Reconstruction <br />Phase 2 <br /> <br />Overview of Alternatives <br />. 44 ft. Roadway, No Median: ($1.54 million) <br />. 44 ft. Roadway, 12 ft, Median, 16 ft, Lanes: ($1.59 million) <br />. 44 ft, Roadway, Decorative Paved Median (not raised): ($1.65 million) <br />. 50 ft. Roadway, 18 ft, Median, 16 ft, Lanes: ($1.78 million) <br /> <br />Discussion: <br />. All Alternatives Include 10 ft Boulevard On West Side <br />. All Alternatives Include 12,5 ft Boulevard, 6 ft Sidewalk <br />. All Alternatives Include Acquisition of 15 ft Utility Easement (sidewalk in easement) <br />. 12 ft Median Does Not Allow For Median Finger at Turn Lanes <br />. 12 ft Median Provides More Room (than 18 ft. median with fingers) for Trucks Entering <br />Roadway from Businesses <br />. Raised Median Options Allow for One Truck in Turn Lane at a Time <br />. Decorative Paved Median <br />A) Colored and Stamped Concrete-Net Cost Approx $70,000.00 <br />B) Paver Bricks-Net Cost Approx $60,000,00 <br />C) Subject to Damage/Discoloration From Traffic - Oil, Tire Marks, Salt, Plows <br />D) Effect of Median Lost During Winter Months <br />E) Doesn't Allow for Plantings in Roadway, Similar Visual Characteristics as No <br />Median Option <br />. Landscape Median Treatments <br />A)Approximate Cost <br />B)Maintenance Effort <br />C)Irrigation <br />. West Boulevard Landscape Treatments <br />A)Approximate Cost <br />B)Maintenance Effort <br />C)MnDOT Fence- $50,000,00 Replacement Cost for Vinyl Coated <br />. East Boulevard Landscape Treatments <br />A)Approximate Cost <br />B)Maintenance Effort <br />C)Coordination with Business Owners <br />. Pedestrian Lighting Along East Side <br />. Undergrounding Existing Overhead Electrical Lines <br />A)Possible Locations: North of Gateway Court - $10,000,00 <br />Gateway Court - $31,000,00 <br />13th St. to Gateway Court - $20,000,00 <br />B)Crossing of West Round Lake Road at Gateway Ct Must Remain Overhead <br />C) Five Poles on West Boulevard, One Pole on East Boulevard <br />. Storm Drainage at Medians <br />A) Cost - Approximately $50,000,00 <br />B) Benefits - Collects Spring Melt Water, Reduces Freezing Over Lane <br />