My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-10-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 05-10-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:08 PM
Creation date
11/13/2006 11:11:31 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />. <br /> <br />r )(h~b~+ c ~ <br /> <br />.'BRW <br /> <br />.. . ADAMES"&. MOORE"GROUP"CiSM'PANY <br /> <br />MEMORANDUM <br /> <br />BRW <br />Thresher Square <br />700 South Third Street <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />Nancy Randall/Arden Hills <br /> <br />File:3 79510052001 <br /> <br />From: Greg Brown <br /> <br />Date: April 20, 1999 <br /> <br />Subject: Planning Case #99-05 (Bethel College) <br /> <br />I have reviewed the proposed parking lot construction on the Bethel Campus and have the following <br />comments: <br /> <br />. <br /> <br />Recommend that the access roadway to the parking lot be altered to reduce the slope, The <br />plan shows a 10% profile grade which is quite severe for a road ofthis nature especially <br />considering the future extension of the road to TH 51. The grading of the parking lot should <br />be altered to allow a lower entrance from the south by 2'-3 which would allow the roadway to <br />have a profile grade around 7%-8%, <br /> <br />. <br /> <br />Concur with the planning commission/City staff comments regarding the layout of some of the <br />parking stalls and the flow of the lot (noted as areas 1,2,3 and 4 in commission <br />correspondence), Suggest that the developer review the flow of the lot and make adjustments <br />as needed, <br /> <br />If you have any further questions please give me a call, <br /> <br />RECEIVED <br />APR 2 0 1999 <br /> <br />OlY Of ARUUi t111.1.S <br /> <br />U:\WPDOCS\ARDENHILIPLANNING\BETHELOT.MEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.