Laserfiche WebLink
<br />.>1 - <br /> <br />. <br /> <br />- <br /> <br />Department of Public Works <br />Paul L. Kirkwold, P.E., Director and County Engineer <br /> <br /> <br />ADMINISTRATION/LAND SURVEY <br />50 West Kellogg Blvd., Suite 910 <br />St. Paul, MN 55102. (651) 266-2600. Fax 266-2615 <br />Ecmail: PublicWorks@pw.co.ramsey.mn.us <br /> <br />ENGINE ERING/OPERA TI ONS <br />3377 N. Rice Street <br />Shoreview, MN 55126 <br />R~~~'~~ 482-5232 <br /> <br />APR 2 8 1999 <br /> <br />(lTI Of A\\ULi~ i1lllS <br /> <br />April 27, 1999 <br /> <br />Dear City Administrator/City Engineer: <br /> <br />Re: Replacement of the County Public Works Facility <br /> <br />Over the past several years, Ramsey County Public Works has been discussing the <br />replacement of our facility on Rice Street in Shoreview. We have actively pursued the <br />concept of a joint use facility located,in the Twin City Arms and Ammunition Plant <br />(TCMP) in Arden Hills. You have, at one point in time, indicated you may have an <br />interest in entering into a partnership agreement for shared use of this joint facility, <br /> <br />e <br /> <br />We continue to pursue the acquisition via a lease arrangement with the Minnesota <br />National Guard. Our current plan for development of the facility is joint use with the <br />Guard and, most likely, Arden Hills. Throughout the process, we have intended to make <br />accommodations for other partners provided their use is in concert and of the same <br />quality as that proposed by the base partners, The Guard, Arden Hills and Ramsey <br />County Public Works. Our current schedule is to have the Guard/Army lease finalized <br />by mid-summer. <br /> <br />The Ramsey County Commissioners have authorized our department to contract for <br />architectural services that will assist us in determining the space requirements <br />necessary for our functions. This "Space Needs Assessment" is necessary to accurately <br />pin down the cost for the project and will allow us to accurately describe our needs when <br />we come to the table with the Guard. We feel that by doing this independently we will be <br />in a better position to look at opportunities to share space. <br /> <br />The space needs assessment study will be done for the County by TKDA and Assoc. <br />They were chosen through a RFP process approved by the Board. The contract utilizes <br />an analysis of our current functions, compares the desires of staff with known <br />established standards and provides a concept floor plan and cost estimate. The <br />assessment will be valuable to us whether the County participates in the joint facility <br />construction or chooses to build a separate facility should the TCMP arrangement not <br />materialize, <br /> <br />e <br /> <br />If you are still interested in participating in the Joint Facility development project located <br />at TCMP, I would urge your agency to begin a similar process. The TKDA contract is <br />available to you and the enclosure describes the work performed by them. I understand <br />the unknowns of the TCMP arrangement makes this type of study a risk but if you are <br />facing a space dilemma it may be worth the effort. <br /> <br />Mlnnesota's First Home Rule County <br />printed on recycled paper with a minimumo1l0515 post.consumer oontent <br />.- <br />