Laserfiche WebLink
<br />e <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />September 13, 1999 <br />Mayor and City Council ~ / _ <br />Nancy Randall, Associat~ <br /> <br />DATE: <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Case #99-17, Site Plan Review <br />Guidant (CPI), 4354-4369 Round Lake Road <br /> <br />Request. The petitioner is requesting approval of a site plan to allow for a 12 foot 9 1/2 <br />inch by 4 foot 3 inch, generator for their facility located at 4354-4369 Round Lake Road. <br />(Exhibit A). <br /> <br />. <br /> <br />Background. The City Council approved a request for a Site Plan Review for a <br />office/warehouse building with Planning Case 86-15 (Exhibit B). Guidant (CPI) utilizes <br />a portion of the building for its shipping and receiving. The generator is proposed to be 6 <br />foot 7 inches tall and setback from the building 10 feet. The generator would be used <br />during power outages and once a month for preventative maintenance. <br /> <br />The generator is proposed on the south side of the building in the loading dock area 10 <br />feet from the building. This area is not visible from public right-of-way however, is <br />visible from the property to the south. The proposed generator would meet the height and <br />setback regulations, <br /> <br />The Zoning , Ordinance in Section VI, E, 4, states that screening shall be provided where <br />mechanical operating equipment is located on the ground or the roof of the premises. <br />The proposed generator has an enclosure to weatherproof and reduce sound. Staff <br />recommends a fence or wall be placed along the south side to screen the generator from <br />the neighboring lot. <br /> <br />The applicant is proposing an enclosure to reduce the sound. The applicant has supplied <br />staff with numbers showing the proposed sound levels and a list of comparable sounds. <br />The numbers all fall below a diesel truck, which are currently used in this area. <br /> <br />e <br /> <br />Deadline for Agency Actions. The City of Arden Hills received the complete <br />application for this request on Friday, August 6, 1999. Pursuant to Minnesota State <br />Statute, the City must act on this request by Tuesday, October 5, 1999 (60 days), unless <br />the City provides the petitioner with written reasons for an additional 60-day review <br />period. The additional review period would extend to Friday, December 3, 1999. The <br />City may, with the petitioners' consent, extend the review period beyond the Friday, <br />December 3,1999 date. <br />