Laserfiche WebLink
<br />t <br /> APPLICATION FOR PARTIAL PAYMENT <br />\ LIFT STATION #3 RECONSTRUCTION PROJECT <br /> CITY OF ARDEN HILLS <br />e <br /> BRW File: 37951*006*0101 1/19/99 <br /> Page: 1 <br /> -- _____....___n___ <br /> Seq. No/ Unit Contract Contract To Date To Date <br /> MnDot No Item Unit Price Quantity Amount Quantity Amount <br /> -------- ------------------------ ------- ---------- --------- ----------- --------- ----------- <br /> Bid Schedule: A - LIFT STATION #3 RECONSTRUCTION <br /> 1 MOBILIZATION LS 3200.00 1. 00 3200.00 0.50 1600.0C <br /> 2021.501 <br /> 2 CLEARING TREE 200.00 3.00 600.00 2.00 400.0C <br /> 2101.502 <br /> 3 GRUBBING TREE 150.00 3.00 450.00 2.00 300.0C <br /> 2101.507 <br /> 4 REMOVE SEWER PIPE LF 5.00 10.00 50.00 0.00 0.00 <br /> 2104.501 <br /> 5 AGGREGATE BASE CLASS 5 TON 15.00 90.00 1350.00 0.00 0.00 <br /> 2211.503 (100% CRUSHED LIMESTONE) <br />4It0~.511 8" PVC, SDR 26 SANITARY LF 55.00 15.00 825.00 25.00 1375.00 <br />SEWER <br /> 7 F&I LIFT STATION LS 33980.00 1.00 33980.00 0.10 3398.00 <br /> 2503.601 EQUIPMENT AND PIPING <br /> 8 F&I LIFT STATION LS 3500.00 1.00 3500.00 0.00 0.00 <br /> 2503.601 ELECTRICAL SYSTEM <br /> 9 CONNECT TO EXISTING EA 500.00 1. 00 500.00 1.60 800.00 <br /> 2503.602 SANITARY MANHOLE <br /> 10 REBUILD SANITARY SEWER LS 500.00 1.00 500.00 0.00 0.00 <br /> 2503.602 MANHOLE INVERT <br /> 11 CONNECT TO EXISTING EA 500.00 1. 00 500.00 0.00 0.00 <br /> 2503.603 SANITARY FORCE MAIN <br /> 12 6" DIP FORCEMAIN LF 82.05 40.00 3282.00 0.00 0.00 <br /> 2503.603 <br /> 13 7211 DIA. SANITARY VALVE EA 6000.00 1. 00 6000.00 0.80 4800.00 <br /> 2506.602 MANHOLE <br /> 14 72" DIA. LIFT STATION EA 11906.00 1. 00 11906.00 0.80 9524.80 <br />.6.602 WET WELL W/ACCESS HATCH <br /> 15 SILT FENCE TYPE HEAVY LF 2.00 180.00 360.00 100.00 200.00 <br /> 2573.502 DUTY <br />