Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />Emergency Operations Plan <br />Standinl! Overatinl! Procedure <br /> <br />Public Works Director <br /> <br />RESPONSIBILITY: <br /> <br />The Public Works Director shall coordinate all civil engineering <br />issues arising from the disaster. This may include maintenance <br />personnel to clear streets and remove debris, and engineering staff to <br />assess damage to roads, bridges, etc. <br /> <br />PUBLIC WORKS DIRECTOR'S CHECKLIST <br /> <br />I. Alert Public Works personnel <br /> <br />2. Obtain briefmg on emergency situation <br /> <br />3. Take count of Public Works personnel and set up recovery teams <br /> <br />4. Check out emergency equipment requirements <br /> <br />5. Brief crews and dispatch to emergency area <br /> <br />6. Check out emergency supply stocks <br /> <br />7. Set up record system on personnel time, equipment time, and supplies <br />consumption <br /> <br />8. Check out road clearing and emergency repair requirements <br /> <br />9. Check out debris collection and disposal requirements <br /> <br />10. Assign crews to tree removal, boarding-up damaged structures, etc. <br /> <br />11. Check out City water system and pump operation <br /> <br />12. Check out sanitary sewer and lift station operation <br /> <br />13. Check out emergency electrical power requirements <br /> <br />14. Check out storm drainage channels and flood prone areas <br /> <br />15. Maintain map record of emergency problem areas <br /> <br />25 <br />