My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-12-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 04-12-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:21 PM
Creation date
11/13/2006 11:16:30 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />; <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />/' <br /> <br />/ BRW Copy <br />City Copy <br />Gontractor COpy <br />Inspector Copy <br /> <br />CITY OF ARDEN HILLS <br />CONTRACT CHANGE ORDER <br /> <br />Project: <br /> <br />West Round Lake Rqad Improvements Phase 1 <br /> <br />Change Order Number: <br />Date: <br />Contractor: <br /> <br />1 (One) <br />April 12, 1999 <br />Forest Lake Contracting, Inc. <br /> <br />The additions, revisions and corrections contained herein shall be made to the contract documents for the <br />project and shall become a part ofthe Scope of Work. <br /> <br />Description of Changes: <br /> <br />A. <br /> <br />The contract shall be modified to include a change in the contract completion dates to reflect a later <br />start time. <br /> <br />The dates in the Contract Construction Schedule shall be changed to reflect the site being available <br />for construction to begin on April 12, 1999. The work shall be completed within one hundred and <br />twenty-five (125) calendar days as stated in the project specifications. All work for the West RoUnd <br />Lake Road Improvements, Phase 1 shall be completed by August 14, 1999. Excess topsoil from the <br />stockpile may be stored in the northwest section of the site. The Contractor shall have until <br />December 31, 1999 to remove all excavated topsoil from the project site. The landscaping and tree <br />planting are subject to MnDOT requirements and planting dates and may extend beyond the August <br />14,1999 date. <br /> <br />The contractor shall be responsible for Liquidated Damages in the amount of $500.00 per each <br />calendar day that the work is not complete, beyond August 14, 1999. <br /> <br />B. The contract shall be modified to reflect a reduction in the topsoil removal price from $1.60/m3 to <br />$0.00/m3. The reduction in the topsoil removal unit price will result in a net contract deduction as <br />follows: <br /> <br />BID ALTERNATE A (ADD+/DEDUCT-) <br /> <br />Seq. No.1 <br />MnlDOT <br />No. <br /> <br />Original <br />Unit <br />Price <br /> <br />C.O.#1 <br />Unit <br />Price <br /> <br />Amount <br />Add/ <br />(Deduct) <br /> <br />Item <br /> <br />Contract <br />Unit Quantity <br /> <br />II <br />2105.501 <br /> <br />20,000.00 <br /> <br />$1.60 <br /> <br />$0.00 <br /> <br />($32,000.00) <br />($32,000.00) <br /> <br />Topsoil Excavation m3 <br /> <br />Net Contract Deduct, <br /> <br />COl-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.