Laserfiche WebLink
<br />ARDEN HILLS PLANNING COMMISSION - MAY 7, 1999 <br /> <br />DRAFT <br /> <br />6 <br /> <br />, <br /> <br />Commissioner Sand asked if the final grading plan must be submitted prior to review of the fmal <br />plat. Mr. Ringwald stated that final grading plans would be provided and reviewed when the . <br />requests for building permits are submitted. <br /> <br />Commissioner Duchenes noted that the easement along the north side of the property for access <br />to the Bachman property ends at a dead end street, which will not be brought straight through for <br />an undetermined period of time. She asked if the access would be a temporary driveway. Ms. <br />Randall stated that the access would be temporary. She indicated that it would be a situation <br />similar to a driveway crossing a right-of-way to access the pavement. <br /> <br />Commissioner Duchenes asked if staff had planned on a formal agreement for who will maintain <br />the road. Mr. Ringwald stated that a formal agreement would not be needed at this situation is <br />similar to a driveway crossing a boulevard. <br /> <br />Commissioner Nelson moved, seconded by Commissioner Duchenes to recommend <br />approval of Planning Case #99-03, preliminary plat including the variances for a lot <br />width of 80 feet where 85 feet is required for Block 1 lots 1 and 2, and Block 2 lots 1 and <br />2, be approved, based on the findings of the variance section of the Staff report dated <br />May 5,1999, subject to the following conditions: <br /> <br />1. Title information be submitted to the City for review by the City Attorney. <br /> <br />2. Extension of Shoreline Lane through the subject property be deeded to the City. <br /> <br />3. <br /> <br />Provide staff with proposed grading and sediment and erosion control measures <br />that are proposed to be used on this project for staff approval, and the revised <br />grading plan be submitted for approval. <br /> <br />. <br /> <br />4. Payment of appropriate Park Dedication as determined by the City Council as <br />provided for by the Subdivision Ordinance in Section 22-9 of the City Code. <br /> <br />5. Payment ofan Escrow for future extension of Shoreline Lane to the north <br />property line. <br /> <br />6. Approval by Rice Creek Watershed District. <br /> <br />7. Basement elevations not be below 887.8 feet. <br /> <br />8. Utility and drainage easements be provided per the Subdivision Ordinance <br />Section 22-8 of the City Code. <br /> <br />9. Construction specifications for street and utilities be submitted with the final plat <br />submittal. <br /> <br />10. <br /> <br />Easements in a form acceptable to the City Engineer and City Attorney be granted <br />to the City for temporary cul-de-sac, and the documents be submitted with the <br />final plat application. <br /> <br />. <br /> <br />11. Right-of-way from the south property be acquired prior to final plat for access to <br />the property. <br />