Laserfiche WebLink
<br />i <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />June 9, 1999 <br /> <br />TO: <br /> <br />Brian Fritsinger, City Administrator <br /> <br />Thomas J. Moore, Parks and Recreation Director ~ d - ~ <br /> <br />Replacement ofthe Arden Oaks Playstructure <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Backl!TOUud <br />The existing Playstructure at Arden Oaks Park was installed in the summer of 1985. It is a <br />wooden and steel structure that is showing it's age. The wood is in poor condition and the steel is <br />rusting. <br /> <br />1999 Budl!et <br />The 1999 Capital Improvement Plan allocated $15,000 for this project. The City received three <br />quotes from companies expressing interest in this project. Each company provided two options <br />as part of their quote. Each option was based upon a different layout design and playground <br />equipment. <br /> <br />In previous replacement projects, the cost of professional installation was not included in the <br />overall cost. The City of Arden Hills Park Maintenance Staff provided installation. The Park <br />Maintenance Staff would spend as much as five weeks on installation. Professional installers can <br />get the project done in 7 -10 days. In addition, utilizing professional installers reduces the risk <br />of improper installation and the voiding of certain warranties. <br /> <br />Parks & Recreation Committee Recommendation <br />The Committee reviewed the three bids at the April 27, 1999 Parks & Recreation Committee <br />meeting. A Neighborhood meeting was held on May 18, 1999. The bid selected was; Option #1 <br />from the Miracle Recreation Equipment Company. Cost for the Playstructure is; $14,996.86. The <br />cost for complete installation is; $2,730. Total cost for the project, including Sales Tax, is; <br />$17,726.86. <br /> <br />Staff Recommendation <br />Staff recommends that the Playstructure at Arden Oaks Park be replaced and that the Miracle <br />Recreation Equipment Company provides complete installation at a total cost not to exceed <br />$ 17,726.86. The additional cost of installation can be taken from the Park Fund. <br />