Laserfiche WebLink
<br />permit or an extension of the old permit before working after the end date of the previous permit. <br />This supplementary application must be done before the permit end date. <br /> <br />e <br /> <br />Sec. 1.15.. Other Obligations. <br /> <br />Subd. 1. Compliance With Other Laws. Obtaining a right-of-way permit does not relieve <br />permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all <br />fees required by any other City, County, State, or Federal rules, laws or regulations. A permittee <br />shall comply with all requirements oflocal, state and federal laws, including Minn. Stat. 99 <br />216D.01-.09 ("One Call Excavation Notice System"). A permittee shall perform all work in <br />conformance with all applicable codes and established rules and regulations, and is responsible <br />for all work done in the right-of-way pursuant to its permit, regardless of who does the work. <br /> <br />Subd..2. Prohibited Work. Except in an emergency, and with the approval of the Director, no <br />right-of-way obstruction or excavation may be done when seasonally prohibited or when <br />conditions are unreasonable for such work. <br /> <br />Subd.3. Interference with Right-oj-Way. A permittee shall not so obstruct a right-of-way that <br />the natural free and clear passage of water through the gutters or other waterways shall be <br />interfered with. Private vehicles may not be parked within or next to a permit area. The loading <br />or unloading of trucks next to a permit area is prohibited unless specifically authorized by the <br />permit. <br /> <br />Sec. 1.16. Denial of permit. <br /> <br />e <br /> <br />Subd. 1. Mandatory Denial. Except in an emergency, no right-of-way permit will be granted: <br /> <br />(a) To any person required by Sec. 1.05 to be registered who has not done so; <br /> <br />(b) To any person required by Sec. 1.08 to file an annual report but has failed to do so; <br /> <br />(c) For any Next-year Project not listed in the construction and major maintenance plan <br />required under Section 1.08; <br /> <br />(d) For any project which requires the excavation of any portion of a right-of-way which <br />was constructed or reconstructed within the preceding five years; <br /> <br />(e) To any person who has failed within the past three (3) years to comply, or is <br />presently not in full compliance, with the requirements of this Chapter; <br /> <br />, <br /> <br />(f) To any person as to whom there exists grounds for the revocation of a permit under <br />Sec. 1.21; or <br /> <br />(g) If, in the discretion of the Director, the issuance ofa permit for the particular date <br />and/or time would cause a conflict or interfere with an exhibition, celebration, festival, or <br />any other event. The Director, in exercising this discretion, shall be guided by the safety <br />and convenience of ordinary travel of the public over the right-of-way, and by <br />considerations relating to the public health, safety and welfare. <br /> <br />.- <br /> <br />12 <br />