<br />e <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />July 23, 1999 <br /> <br />TO: <br /> <br />Brian Fritsinger, City Administrator <br /> <br />Dwayne Stafford, Public Works Director 9~ <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Public Works Department, Monthly Report <br /> <br />1998 Street Imvrovement Proiect <br />Little, if any, work has been done this past month on punch list items remaining to complete the <br />project. <br /> <br />Gatewav Boulevard <br />Uneven pavement problems have not been resolved as of yet. (The City Engineer has informed <br />the contractor that the City is not happy with the final layer of blacktop.) <br /> <br />West Round Lake Road. Phase I <br />Curb work is complete and base material is being spread to grade. The road is nearly ready for <br />e the first layer of blacktop. <br /> <br />BRW Street Re-Ratine: <br />The rerating field work is complete, and BR W is in the process of producing a report on the <br />outcome. <br /> <br />Residential Water Meters <br />Two (2) bids were received for the residential meter replacement project. Bids were less than the <br />Public Works Director's estimate, and a recommendation on accepting the low bid will follow. <br /> <br />1999 Seal Coat Proiect <br />One bid was received for the 1999 Seal Coating, which included Lake Valentine Road, <br />Briarknoll Drive, Briarknoll Circle, Keithson Drive, Arden View Drive, and Arden View Court. <br />No bids were received on the Lexington Trail sealcoat, as the specified slurry mix is not <br />available anymore this year. The City engineer will look at an alternative mix. <br /> <br />Bids came in very close to the engineer's estimate, and a recommendation for acceptance will <br />follow. <br /> <br />e <br />