Laserfiche WebLink
<br />,. <br /> <br />" <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />CITY OF ARDEN HILLS <br />CONTRACT CHANGE ORDER <br /> <br />/'BRW T"-~" <br />Owner ,,-~.. <br />Contracto' <br />Inspector Copy <br /> <br />Project: <br /> <br />West Round Lake Road Improvements Phase I <br /> <br />Change Order Number: <br />Date: <br />Contractor: <br /> <br />2(Two) <br />August 9, 1999 <br />Forest Lake Contracting, Inc. <br /> <br />The additions, revisions and corrections contained herein shall be made to the contract documents for the <br />project and shall become a part of the Scope of Work. <br /> <br />Description of Changes: <br /> <br />A. Intersection Modifications <br /> <br />The contract shall be modified to include additional work in the West Round Lake Road CSAH 96 <br />intersection temporary signal and turn lanes. By the direction of Ramsey County, the intersection <br />design was modified to include additional signal loops and turn lanes. <br /> <br />BID SCHEDULE A: ROADWAY <br /> <br />Seq. No.1 <br />Mn/DOT <br />No. <br /> <br />Original <br />Contract <br />Unit Quantity <br /> <br />C.0.#2 <br />Contract <br />Quantity <br /> <br />Amount <br />Add! <br />(Deduct) <br /> <br />Item <br /> <br />Unit <br />Price <br /> <br />22/ <br />2331.508 Type 41 Wear Course t 745.00 $30.00 136.00 <br /> Mixture <br />35/ <br />2563.604 Traffic Control LS 1.00 $4000 .38 <br />36/ <br />2565.616.1 Temporary Signal SigSys 1.00 $52,000.00 .18 <br /> System <br />47/ <br />0000.00 Bituminous Patch m2 0.00 $28.00 100.00 <br /> Contract Addition <br /> <br />$4,080.00 <br /> <br />$1520.00 <br /> <br />$9360.00 <br /> <br />$2800.00 <br /> <br />$17,760.00 <br />