Laserfiche WebLink
<br />,. <br /> <br />\ <br />\ <br /> <br />'RDEN MANOR PARK RENOVATION <br />ARDEN HILLS. MINNESOTA <br />PRELIMINARY COST ESTIMATE FOR PARK IMPROVEMENTS <br /> <br />6118/99 <br /> <br /> <br />SITE PREPARATION <br />1 Mobilization LS 1 $5.000.00 $5.000.00 <br />2 General Site Gredln AC 0.9 $5.600.00 $5,040.00 <br />3 Removals not includin back st LS 1 $11,000.00 $11,000.00 <br />4 Common Borrow loose vol "* CY 3500 $5.00 $17,500.00 . <br />5 Siit Fence LF 500 $2.00 $1,000.00 <br />Park.lm rovements <br />6 B..kelban Court LS 1 $25,000.00 $25,000.00 <br />7 Pia Structure LS 1 $23,000.00 $23,000.00 <br />B En Ineered Floodwe LS 1 $10.000.00 $10,000.00 <br />9 Land Srid e Culvert and Gradin LS 1 $16,000.00 $16,000.00 <br />10 Relocated Sheiter LS 1 $5,000.00 $5.000.00 <br />11 Sheller Footin EA 4 $500.00 $2,000.00 <br />12 Shelter Slab SF 900 $2.89 $2 600.00 <br />13 SeedlSod LS 1 $2 500.00 $2,500.00 . <br />.' <br /> <br />, lOlAL ESTlMA1ED CONSTRUC1ION COSTS. $125,640.00 <br />. Item 4 may be accomplished with lopsoil malerlals already purchased by the city as a part of lhe -- <br />Round Lake Road Improvements. <br />. L.- <br /> <br />.~ <br /> <br />e <br />