Laserfiche WebLink
<br />City of Arden Hills <br /> <br />Chapter 12 Subdivisions <br /> <br />poses. <br /> <br />. <br /> <br />Section 1230 - Required Improvements <br /> <br />---------A.--No-fiaal-plat--shall-be-apj:lfoved-by.tfie--Gity--G-ellfiEil;mkss-the-&wner-6f--5\IMivideFf <br />1230.01 Survey Monuments. SIlall.fiave-p1ac-e&lIOO-~Survey monuments ~MU~!pl~ <br /> <br />W'i:~i@~~.:at all block corners, angle points, points of curves in streets and at intermediate <br /> <br />points as shown on the fmal plat required by the City engineer.~sueh-::tSwyi@i::monuments shall <br /> <br />be cast iron, as approved by the county surveyor, and shall be set at each corner or angle on the <br /> <br />outside boundary. Pipes or steel rods shall be placed at the corners of each lot and at each <br /> <br />intersection of street centerlines. All United States, state, county, or other official bench marks, <br /> <br />. <br /> <br />monuments or triangulation stations in or adjacent to the property shall be preserved in precise <br /> <br />position. ,-and <br /> <br />1230.02 Water. SflaH-haye-tletermUletl-The most feasible method of obtaining water for the <br /> <br />subdivision ~'hil11:bt:JkWniiliiliil:?"';t':be in a sition to ~tdemonstrat'lld suelt-feasibif -to the <br />, ..........................................~~.. po .--....... Ny, <br /> <br />satisfaction of the City Council or such technical agents as it may designate. ;-&ntl-&:~W,~ <br /> <br />~:be willing and able to contract with the City (as a condition of subdivision plat approval) to <br /> <br />produce the type of water supply demonstrated most feasible for the subdivision.; Water may be <br /> <br />provided by individual house wells or by a system consisting of central well(s) and pumping <br /> <br />station(s) and piping to supply individual homes. It is-$."WIUJ-imthe announced policy of the City <br /> <br />that a central well system for each new subdivision is favored on the basis of greater assurance <br /> <br />. <br /> <br />of public health, reliability of supply, economy in installation of purification equipment if <br /> <br />12 - 30 <br />