My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-16-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 08-16-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:35 PM
Creation date
11/13/2006 11:24:18 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />, <br /> <br />ARDEN HILLS STREET MAINTENANCE PROGRAM <br />1999 RERA TING DISCUSSION POINTS <br /> <br />ARDEN HILLS CITY COUNCIL WORKSESSION <br />MONDAY, AUGUST 16, 1999 <br /> <br />I. Overview of Proposed Neighborhood Delineation <br />* See Attached Map <br />II. Composite Neighborhood Rankings and Related Issues <br />* See Attached Spreadsheets <br />III. Proposed Street WidthlDesign Standards <br />* Current Standard is 32' Face to Face with B618 Concrete Curb and Gutter <br />* Several Existing Streets Have Widths Between 20' and 30' <br />* Consider Adopting Several Standard Sections for Specific Conditions <br />** Low Volume Residential/CuI de Sac Streets 24'-28' <br />** Medium Volume Residential Through Streets 32' <br />** Commercial/Collector Streets 36' - 50' <br />** Parking Bays?? <br />* Some Un standard Streets Serve 1-3 Parcels - Consider Driveways Instead? <br /> <br />IV. Discussion of Annual Budgeted Costs <br />* Maintain Current Levels <br />** Construction Approximately $800,000.00 (bid amount) <br />** Sealcoating Approximately $20,000.00 (bid amount) <br />* Work Identified in Survey <br />** Reconstruction to Standards = $16,000,000.00 (20 yrs at current rate) <br />** Sealcoating Recommended Every 10 years = $35,000.00/yr <br />** Overlay Work not Included in First Neighborhoods <br />* Front End Loaded Approach <br />** Increase Budget to Bring all Substandard Streets Up To Par Within X Years <br />** Future Budgets Will Reflect to Predominantly Overlay and Reclamation Work <br /> <br />V. Proposed Work Program/Street Life Cycle <br />* Recommend Reconstruction Program Every 2 years <br />* Recommend Sealcoating and Overlay Work on "off years" <br />* See Attached Example Schedule and Chart <br /> <br />PAGE 1 OF2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.