My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-16-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 08-16-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:35 PM
Creation date
11/13/2006 11:24:18 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br /> CITY OF ARDEN HILLS <br />FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br />DEPARTMENT PROJECT TITLE PROJECT FIVE-YEAR COST <br />Parks and Recreation S, Round Lake NUMBER <br /> Trail (Welsh to 609-00 $227,000 <br /> Parkshore Drive) <br />SCHEDULED PROJECT ACTIVITY <br />FUNDING SOURCE 2000 2001 2002 2003 2004 FUTURE <br />Possible DNR Grant, $227,000 <br />Park Fund <br />LOCATION <br />West Round Lake Road area (Gateway Business District) <br />DESCRIPTION <br />This project would include the construction of a pedestrian/bike trail along the south side of <br />Round Lake, Specifically, it would complete the loop from the existing trail, constructed as part <br />of the Welsh Development project, east to Parkshore Drive. It would require the acquisition of <br />easements of land for the trail. <br />JUSTIFICATION <br />The trail would complete the line through the GBD and around the lake. Eventually, it will <br />connect into a proposed trail into New Brighton and south along Old Highway 10, <br />CURRENTSTATUS~ROJECTEDSCHEDULE <br />The City has held preliminary discussions with Dan Vaughan, property owner. <br />RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.