My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-08-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 11-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:43 PM
Creation date
11/13/2006 11:27:31 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />INTRODUCTION <br /> <br />On October 12, 1999, the Arden Hills City Council authorized the preparation of a feasibility <br />study for the 2000 Street Improvements Project. This project includes the reconstruction of <br />several streets within the Ingerson Road Neighborhood. The neighborhood is bound by <br />Lexington A venue on the east, Highway 51 on the west, Lake Josephine on the south and a series <br />of wetlands, ditches and open space areas to the north. Neighborhood streets that are identified <br />for reconstruction include the following: <br />Existing Proposed <br />Street Name Width Width <br />Ingerson Road 27 32 <br />Ingerson Court 24 24 <br />Fernwood Street 27 28 <br />Fernwood Court 26 24 <br />Cannon Avenue 24-28 28 <br />Hamline Avenue (north) 22 28 <br />Hamline Avenue (south) 24 32 <br />*These roadways were constructed during or prior to 1961 <br /> <br />PCI <br />Rating <br />65 <br />37 <br />77 <br />86 <br />44 <br />11 <br />59 <br /> <br />Last Known <br />Roadwork <br />1961 * <br />1%1* <br />1989 <br />1989 <br />1961* <br />1961* <br />1961* <br /> <br />The neighborhood as a whole is ranked as a high priority for reconstruction based upon the 1999 <br />Arden Hills Comprehensive Street Condition Assessment Report. The streets identified have <br />Pavement Condition Indexes (PCI) ranging from 11 to 86 with a weighted average of 55. <br />Existing and proposed street widths are shown on the table above. All of the streets included in <br />the study have received no major rehabilitation work since 1961 or earlier except for Fernwood <br />Street and Fernwood Court which were overJayed in 1989. None of the streets currently has <br />concrete curb and gutter although some drainage catch basins exist on Carlton Drive and <br />Fernwood Street. <br /> <br />Ingerson Road and adjacent yards west of Fernwood Street experience localized flooding on a <br />regular basis as the terrain is very flat and no drainage infrastructure exists in this area. The <br />southern portion of the neighborhood drains to Lake Josephine via an inlet located between <br />Ingerson Court and Fernwood Court. The remainder of the neighborhood drains to a wetland <br />located east of Hamline A venue between Ingerson Road and Tiller Lane. Portions of Hamline <br />A venue south of Ingerson road drain directly to the ditch system which eventually flows to Lake <br />Johanna. There are no storm water quality ponds located in the neighborhood currently. <br /> <br />Tiller Lane, Dunlap Street and Dellwood Street have been reconstructed to City standards with <br />concrete curb and gutter and storm sewer within the past ten years and therefor are not <br />programmed for any work in conjunction with this project. It is anticipated that these streets will <br />be sealcoated along with the rest of the Ingerson Road neighborhood in 2001. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.