Laserfiche WebLink
<br />I <br />\t <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />No. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br />Alternative A <br /> <br />CARLTON DRIVE STORM SEWER CONSTRUCTION <br />(BASED ON 28' F-F) <br /> Unit <br />Item Unit Ouantity Price Extension <br />Mobilization LS 1.0 $ 2,500.00 $ 2,500.00 <br />Remove Storm Sewer Pipe LF 300.0 $ 5.00 $ 1,500.00 <br />Remove Storm Sewer Structure EA 6.0 $ 500.00 $ 3,000.00 <br />12" RCP LF 200.0 $ 25.00 $ 5,000.00 <br />21" RCP LF 571.0 $ 36.50 $ 20,800.00 <br />Catch Basin (2' x 3') EA 6.0 $ 1,200.00 $ 7,200.00 <br />Manhole (48") EA 2.0 $ 2,500.00 $ 5,000.00 <br />Manhole (60") EA 1.0 $ 3,000.00 $ 3,000.00 <br /> <br />10% Contingency <br /> <br />$ <br /> <br />4,800.00 <br /> <br />SUBTOTAL <br />26% Indirect Cost and Capitalized Interest <br /> <br />$ <br />$ <br /> <br />52,800.00 <br />13,700.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ <br /> <br />66,500.00 <br />