Laserfiche WebLink
<br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />No. <br /> <br />I <br />2 <br />3 <br />4 <br />5 <br />6 <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br />Alternative A <br /> <br />FERNWOOD COURT STORM SEWER CONSTRUCTION <br />(BASED ON 24' F-F) <br /> Unit <br />Item Unit Quantitv Price Extension <br />Mobilization LS 1.0 $ 600.00 $ 600.00 <br />Remove Storm Sewer Pipe LF 50.0 $ 5.00 $ 300.00 <br />Remove Storm Sewer Structure EA 1.0 $ 500.00 $ 500.00 <br />15" RCP LF 205.0 $ 30.00 $ 6,200.00 <br />Catch Basin (2' x 3') EA 1.0 $ 1,200.00 $ 1,200.00 <br />Manhole Catch Basin (48") EA 1.0 $ 2,500.00 $ 2,500.00 <br /> <br />10% Contingency <br /> <br />$ <br /> <br />1,100.00 <br /> <br />SUBTOTAL <br />26% Indirect Cost and Capitalized Interest <br /> <br />$ <br />$ <br /> <br />12,400.00 <br />3,200.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ <br /> <br />15,600.00 <br />