Laserfiche WebLink
<br />\ <br /> <br />e <br /> <br />e <br /> <br />. <br /> <br />1I~~w <br /> <br />IBE!IiI A"DAMES -,s:"MOOOEGROUPCOMPANY <br /> <br />MEMORANDUM <br /> <br />BRW <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />File: 37951-012-0101 <br /> <br />Terrance R. Post/Arden Hills <br />Interim City Administrator <br /> <br />From: Gregory S, Brown <br />Arden Hills City Engineer <br /> <br />Date: November 4, 1999 <br /> <br />Subject: Change Order #1 <br />Arden Manor Park Improvements <br />McClung Drive Drainage Improvements <br /> <br />Background <br />The City of Arden Hills awarded Nadeau Utility, Inc, of Maple Grove, Minnesota the McClung <br />Drive Drainage Improvements and Arden Manor Park Improvements Project on September 13, <br />1999 for a total contract amount of $158,617.45 <br /> <br />Purpose of Change Order #1 <br />Change Order #1 includes additional work as described below: <br /> <br />By direction of City Staff and the City Engineer the Contractor was ordered to remove an <br />existing, corroded metal pipe and install 80 feet of 24 inch HDPE pipe with grated flared end <br />sections and a 12 foot Concrete Drop Manhole, The work was required to repair the existing <br />pond outlet upstream of McClung Ditch that had been severely undercut from erosion caused by <br />the corroded pipe, If left alone the bank would have eventually been undercut, potentially <br />resulting in flooding down stream, The work was performed on a time and materials basis. The <br />City Engineer has reviewed and concurs with the bill of $10,934.40 submitted by the <br />Contractor. <br /> <br />Recommendations <br />The Arden Hills City Engineer recommends the Council approve Change Order #1 thereby <br />increasing the contract amount by $10,934.40 from $158,617.45 to $169,551.85, <br /> <br />Cc: Mark LynchIBRW <br />Dwayne Stafford! Arden Hills <br />