Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />No. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />FERNWOOD STREET STORM SEWER CONSTRUCTION <br />(BASED ON 32' F-F) <br /> Unit <br />Item Unit Quantitv Price Extension <br />Mobilization LS 1.0 $ 1,500.00 $ 1,500.00 <br />Remove Storm Sewer Pipe LF 347.0 $ 5.00 $ 1,700.00 <br />Remove Storm Sewer Structure EA 3.0 $ 500.00 $ 1,500.00 <br />12" RCP LF 58.0 $ 25.00 $ 1,500.00 <br />27" RCP LF 372.0 $ 48.00 $ 17,900.00 <br />Catch Basin (2' x 3') EA 1.0 $ 1,200.00 $ 1,200.00 <br />Manhole Catch Basin (60") EA 2.0 $ 3,000.00 $ 6,000.00 <br /> <br />10% Contingency <br /> <br />$ <br /> <br />3,100.00 <br /> <br />SUBTOTAL <br />26% Indirect Cost and Capitalized Interest <br /> <br />$ <br />$ <br /> <br />34,400.00 <br />8,900.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ <br /> <br />43,300.00 <br />